My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING AND RESPONSE PLAN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permitolder must ocedures,otify unlessrequiredental Health to blain approval Department, <br />permit b�fare tnalcin ° / I <br />within 30 days of any changes to the monitoringa p - -, I' t� , �1 <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />F F B 14 2003 <br />DATE z 1Z 0' <br />FACILITY NAME t v _ �j S3 3 6 HEALTH <br />� '�� VICESFACILTTY ADDRESS �q o N M �`'`'`" <br />1.Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />SIrJG, N Q I A P &L TbP <br />V1 <br />�- IV[ "� r' <br />2.Describe the frequency of performing the monitoring for: <br />TANKS �ontTI Nu O (l� PIPING <br />/� <br />3.Describe the location(s) of where the monitoring will be performedVI n of sensors <br />,..,� 'hl<pGmgw 1N7'eIST1714L, S�'mpg MND :TjvE^/TD,Q <br />4.Describe the following equipment for each underground storage t nk. <br />of Monitoring Panel TL S' f 35D w �RlN <br />Name and Model V/k V4391) _ Za�. <br />Name and Model of Line Leak Detectors <br />Name and Model of Annular Sensors y <br />Name and Model of Piping Sensors 't l og43�o —2d� <br />Name and Model of Dispenser Sensors t L X100 _ D 3g <br />Type of overfill prevention <br />END 1VKE4faN r <br />5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes d No 1 <br />d No C1 <br />Does the turbine shut down if a sensor is disconnected? <br />Does the turbine shut down is the monitoring panel loses power? Yes CNS No ❑ <br />6. How* the alarm history and subsequent maintenance be recorded? <br />n .._u AAAA, A% <A �%Y AV <br />nce every 12 <br />7.Maintenance of the monitoring equipment must <br />and recording ormed at for the mon monitoring equipments What month will <br />Describe the preventive maintenance schedule l� llE2 Y FeE� 8�%2 <br />annual monitoring certification be performed in? <br />Note: For new installations the secondary <br />initial testing performed before o nt narhs y after <br />2003. <br />installation. All Secondary containment systems <br />must be tested once every 36 months with <br />8. Describe the training necessary for the o eration of UST sste , including piping, and the monitoring <br />equipment <br />IAUnit III\US'Mmnitoringplan.doc <br />5/30/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.