My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_1985-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 1:03:10 PM
Creation date
6/3/2020 9:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1996
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_1985-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. METHOD FOR OVERFILL/SPILL PROTECTION AND CLEAN-UP: (continued) <br />1) The delivery truck driver shall turn off the petroleum product supply <br />at the truck, leaving the hose fully connected to the tank fill pipe <br />and the truck. <br />2) The small amount of petroleum product remaining in the hose shall be <br />slowly drained into the tank. Since the ball float valve is 2" to 3" <br />below the top of the tank, there remains a 100 + gallon capacity within <br />the tank at the moment when the ball float closes off delivery. The <br />bleed hole in the ball float valve allows the remaining petroleum product <br />in the hose to completely drain through the fill pipe into the tank. <br />3) The hose shall be disconnected from the fill pipe only when it has fully <br />drained. In`the event that spillage occurs upon hose disconnection, the <br />remaining small amount of petroleum product will be caught in a 5 gallon <br />capacity leakproof spill container (Pomeco 111 -VE). <br />C) Clean-up/Records: <br />1) Small spills (less than 1 gallon and only requiring 15 minutes to clean up) <br />will be cleaned up using absorbent materials. <br />2) Larger spills will be reported to the terminal by the station operator <br />or by delivery truck driver upon return to the terminal. The terminal <br />supervisor will notify a local Petroleum Maintenance Contractor who is <br />equipped with a N.F.P.A. approved type hand pump, vacuum and transport <br />container. <br />3) Spills will be cleaned up within 8 hours of detection, returned to local <br />terminal and/or disposed of in a lawful manner. <br />4) Station operator shall record all spills whether it is due to delivery <br />overfill or accidental spillage, which exceeds approximately one gallon, <br />and action taken on recordable discharge log - see Form. <br />10. FACILITY INSPECTIONS SUMMARY <br />a. Daily inspections shall be made of: <br />1. Submerged pump boxes <br />2. Fill boxes (also inspected after each delivery) <br />3. Inventory control reconciled <br />b. Monthly inspections shall be made of inventory control records <br />by Unocal. <br />c. Periodic inspections shall be made of dispenser core holes for signs <br />of leakage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.