Laserfiche WebLink
Husky PV Vent Installation/Maintenance Instructions <br />PRESSURE/VACUUM VENT MODEL 4620 AND 4885 <br />INSTALLATION <br />INSTRUCTIONS <br />1. # <br />The PN Vent is designed to fit on top of a 2" vent pipe. Remove the P/V Vent from <br />the carton and visually inspect for any shipping damage. <br />DRAr <br />Model 4620 SIip On P/V Vent <br />The Model 4620 can be installed on <br />either a threaded or not threaded 2" <br />pipe. Hold the P/V Vent upside down <br />SCREWS and place the seal into the vent <br />opening. Using an Allen wrench, back <br />the 4 set screws out so that the PN <br />Vent will slip over the vent pipe. <br />(set screws & seal for Model 4620 only) <br />Place the PN Vent on top of the vent pipe and push or pull down on the PN Vent to <br />slightly compress the seal. Tighten the 4 set screws firmly. Periodic maintenance is <br />recommended (see below). <br />Model 4885 Thread On P/V Vent <br />Apply pipe sealant to the threads on the 2" vent stack. Screw the P/V Vent onto the <br />vent stack and tighten snugly with a suitable wrench. DO NOT OVER -TIGHTEN. <br />Periodic maintenance is recommended (see below). <br />MAINTENANCE <br />To clean or inspect the PN Vent for foreign <br />objects without removing the P/V Vent from the <br />vent pipe: <br />Remove the screws that holds the top <br />cover on. <br />Remove any debris that might be sitting <br />inside the Iower cover. <br />Check the drain holes in the lower cover <br />for blockage.` <br />The two (2) screens should not be <br />removed. <br />Remstall the top cover and retaining <br />screws. <br />6. Tighten the screws firmly. <br />NOTE: DO NOT ALTER OR COVER Tri, P/--/ V7, -P i <br />Page 1 of 1 <br />hf}p://vppp.v.husl�z-y.corn/9041 htr, 7;27/01 <br />