Laserfiche WebLink
Monitoring System Certification <br />i <br />Site Address: 066 �Yt� 3 M i d ' ", �'y 19CA Date of Testing/Servicing: g/ 3 / (> t <br />F. In -Tank Gauging / SIR Equipment: byCheck this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />VVLl&PLGtG <br />❑ Yes <br />alae lVaav llaaai', <br />❑ No* <br />a.aaa...ava- <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />r❑ <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- * In the Section H, below, describe how and when these aeticieneies were yr Will uc cut act tcu. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />ova i A(i's <br />[Yes`Le <br />❑UNo*V„ <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />❑ N/A <br />(Check all that apply) Simulated leak rate: ❑ 3 g.p.h.'; ❑ 0.1 g.p.h.2; ❑ 0.2 g.p.h.'- <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD wart -up. <br />❑ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated?: <br />❑ Yes <br />❑ No*. <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />- ❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />C1 N/A <br />❑ Yes <br />❑ N/A <br />Were all items on the equipment manufacturer's maintenance checklist completed? 71 <br />*In the Section H, below, describe how and `viten tnese aeuciencies Neer c V. NN na ��■ a t. �..a. <br />H. Comments: <br />