Laserfiche WebLink
• <br />UST SYSTEM DRAWING INFORMATION <br />• <br />1. <br />- # � <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /># <br /># <br /># <br />CAPACITY <br />2. <br />_V/ <br />Plans drawn to scale in non -erasable print. <br />3. <br />MANUFACTURER <br />Plot plan to show location of tanks and all associated piping. <br />Lir" <br />4. <br />✓ <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />COMPOSITION <br />5. <br />� <br />Tank cross-sectional diagram. <br />6. <br />✓ <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />.,� <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />Uv{I • <br />:)Up- Urrl. <br />Article 3, Section 2631 (b) & 26351 <br />g, <br />,v <br />V <br />Verification of product compatibility with the tank(s), piping, monitoring <br />1Z� <br />device(s), epoxy or silicone glues, etc. <br />U.L. LISTED <br />9. <br />V <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />COMPATIBILITY WITH 100%. <br />METHANOL <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)) <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)) <br />y, <br />,TANK # .•• -- -- - - <br />- # � <br /># � <br /># <br /># <br /># <br />CAPACITY <br />fZ IU <br />�Z /ax> <br />MANUFACTURER <br />oijeo* 6X, <br />Lir" <br />COMPOSITION <br />r <br />�� <br />MODEL <br />PRODUCT <br />Uv{I • <br />:)Up- Urrl. <br />CORROSION PROTECTION <br />rJRP <br />1Z� <br />U.L. LISTED <br />COMPATIBILITY WITH 100%. <br />METHANOL <br />��s <br />tZ!� <br />13.TANK(s) TO BE INSTALLED lc? relm_41YI <br />_ A- Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C_ Non -clad steel tank (Section 2635 (a) (2) (A)) <br />_ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />