Laserfiche WebLink
01/20/98 TUE 07:55 FAX 5106096304 RHL DESIGN GROUP <br />Easy, Economical <br />installation <br />Lightweight RED THREAD il pipe is <br />available in 15 and 30 ft. random lengths. <br />The easy-to-use TAB:' joint, <br />standard on uuULC RED THREAD It <br />pipe, promotes fast positive <br />makeup and prevents <br />"backouV problems <br />during cure time. <br />The combina- <br />tion of light <br />weight, <br />.cv{ <br />exi <br />bility and - <br />easy joining <br />assures econO <br />mical installatioD <br />joining System <br />The exclusive T.A.B. (Threaded and <br />Bonded) Joint is factory installed. It is <br />the standardjoining system for U!L/ULC <br />Usted RED THREAD 11 pipe. Spigot and <br />%-*nded-on coupling ends are threaded <br />COMPLM <br />Elk I <br />with special profile double -lead <br />threads. Combined with adhesive at <br />time of assembly. the T -A -B. Joint is alsO <br />fast and easy to install. The standard <br />procedure for field -made <br />-p1oxy bonds is achieved by_ <br />he mechanical locking— <br />atching, bell and <br />action of m <br />spigot taper angles. <br />FiWings, compatible with the -- <br />product piping are also listed by <br />Underwtiters Laboratories for use in <br />underground handling of petroleum <br />products. <br />When connecting' containment pipe <br />and fittings, plain endsof thecontairtment <br />pipe are machined or thoroughly sanded <br />to accept the two-piece UIJULC Listed <br />containment fittin& Containment pipe <br />must be positioned over the product <br />piping prior to assembly and bondingof <br />the product pipe system. <br />Upon completion of a successful prod- <br />uct pipe test procedure, the secondary <br />containment fittings may be installed. <br />71M <br />The system -matching <br />adhesive is applied tO -111 <br />bonding surfaces, anti the filfirtal <br />halves are then iklillecl and brnided. <br />Proper assembly .11-10 <br />procedures are detailed it, Smiih Fiber- <br />glass Prpciucts Ni,11jujil Nki. L321 60. Or. <br />contact your local 5111it11 <br />Products (lisitibutor fur a vidt'() <br />presenlition. <br />Special two-piece containment timings usiv- <br />the product p-,pirg to be tested belofe the <br />system is seated. <br />dined bam int`/' <br />411: <br />f -server -2 - I <br />R d. <br />* <br />MIA T"I <br />May <br />M Rarm, " � <br />.9ths <br />L: <br />prslswePSM <br />26,FI741 50, is <br />1000 <br />IQ IDS <br />153a <br />6.89 <br />77 73 <br />c.6 9't <br />700 <br />23 23 <br />t5 30 <br />483 <br />a5 97 <br />sm <br />24 23 <br />Is <br />345 <br />I, <br />dined bam int`/' <br />