My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_1997-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 12:42:13 PM
Creation date
6/3/2020 9:49:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2006
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_1997-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Site Name: <br />30877 <br />Underground Storage Tank <br />Monitoring Program <br />Written Monitoring Procedure <br />2. Site Address and phone number: 1700 East Yosemite Avenue Manteca, CA <br />95336 Tele: 2098237676 <br />C <br />Unocal #: 5417 <br />4/4/97 <br />Page 2 <br />6. Name(s) and title(s) of the person(s) responsible for performing the monitoring and/or maintaining the <br />equipment: <br />Operator Name: James J. McCarthy Tele: 2098237676 <br />Maintenance : Contractor - Banks & Co. - 1 (800) 284-1109 <br />7. Reporting Format: <br />Annual monitoring system certification report; reporting of audible or visual alarm conditions to the local implementing <br />agency, as well as the responsible party for maintenance, listed under item #6. <br />8. State the preventive maintenance schedule for the monitoring equipment. <br />Annual certification of the electronic monitoring system, as recommended by the manufacturer, and repairs are made <br />when notified by station operator. <br />In the event of a test failure, tank is taken out of service and proper reporting procedures are followed. <br />9. Describe the training needed for the operation of both the tank system and the monitoring equipment. <br />The operator has been trained to check the system daily for proper operation and record the date checked on the <br />"Monitoring System Check Log." All alarms are to be recorded on the "Monitoring System Alarm Log" and reported to <br />the responsible party for Maintenance listed under item #6. <br />We have read, completed and understand the foregoing information regarding implementation of this monitoring program <br />for the UST(s) located at this facility, and we will monitor the UST(s) accordingly. <br />Operator: James J. McCarthy <br />Date Printed : 4/4/97 <br />_ r 2i <br />Date <br />Date <br />I / <br />
The URL can be used to link to this page
Your browser does not support the video tag.