My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_1997-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 12:42:13 PM
Creation date
6/3/2020 9:49:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2006
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_1997-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />PUBLIC HEALTH SERVICES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION `° I <br />Karen Furst, M.D., M.P.H., Health Officer <br />304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br />209/468-3420 <br />December 18, 1997 <br />Chris Guterres <br />RHL Design Group Inc. CL <br />1390 Willow Pass Road, Ste 420 <br />Concord, CA 94520 <br />RE: Proposed upgrade of an underground storage tank system <br />located at 1700 E. Yosemite Ave. Manteca, CA. <br />Conditions for approval: <br />1. The primary and secondary piping must undergo the testing <br />criteria of PHS-EHD, as indicated on installation plan <br />application. <br />2. All containment sumps must undergo the lake sump test <br />criteria of PHS-EHD, as indicated on the installation plan <br />application. <br />3. In order for the facility to receive the exemption from the <br />annual line test the pump system must demonstrate positive <br />automatic shut -down. The monitoring system must be able to <br />kill the turbine when the probe senses a leak, malfunctions <br />or when any part of the monitoring system is disconnected. <br />4. Tanks and lines must tested for tightness using a State <br />approved method. The test must be conducted by a licensed <br />tank tester. <br />5. Any portion of the product piping that is damaged or <br />removed are subject to closure requirements prior to being <br />repaired or replaced. <br />Karen Furst, M.D., M.P.H. <br />Health Office <br />Robert McClellon, Sr. R.E.H.S. <br />Environmental Health Division <br />A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.