Laserfiche WebLink
'Y" Ul E <br />UAP RECA'" ffER1 VS., 1: <br />THE PETROLEUM INDUSTRY'S FIRST VAPOR <br />F:: RECOVERYSHEAR VALVE IS CARR APPROVED. <br />Designed by Bravo, the model <br />B-1 set vapor recovery shear. <br />valve passed_ rigorous regulatory <br />testing for approval by the Cali- <br />fornia Air Resources board <br />(GARB) and the California State <br />Fire Marshal. It is the only unit <br />designed specifically to'meet the <br />requirements of Sec. 79.911 of <br />the latest issue of the Uniform <br />Fire Code. The B-1 set's'patent- <br />pending design allows a 100 <br />percent flow, preventing any <br />accidental blockage or suffoca- <br />tion of the vapor recovery sys- <br />tem. Upon impact, it immediately <br />shears and the valve is sealed off. <br />The unit's design does not allow <br />it to seal any other way. <br />The B-1 ffas a cast iron body <br />with a built-in pressure test <br />port.:A shear top constructed of <br />Celcon' acetal copolymer makes. <br />it compatible with all fuels: <br />Both the B-1 set and the- eco- <br />nomically replaceable Celcon' <br />shear top (Model B-IRT)`fit <br />every petroleum dispenser <br />containment system in the <br />market, regardless of brand or --- <br />model. <br />.0 C.- SCLIKE CISPE%'SER <br />A <br />FIM• <br />0 <br />y <br />Fai <br />rry2J' <br /><tIry �p <br />• <br />46 <br />49 <br />C, <br />- <br />- s 4 <br />P ®1 <br />/ <br />Designed by Bravo, the model <br />B-1 set vapor recovery shear. <br />valve passed_ rigorous regulatory <br />testing for approval by the Cali- <br />fornia Air Resources board <br />(GARB) and the California State <br />Fire Marshal. It is the only unit <br />designed specifically to'meet the <br />requirements of Sec. 79.911 of <br />the latest issue of the Uniform <br />Fire Code. The B-1 set's'patent- <br />pending design allows a 100 <br />percent flow, preventing any <br />accidental blockage or suffoca- <br />tion of the vapor recovery sys- <br />tem. Upon impact, it immediately <br />shears and the valve is sealed off. <br />The unit's design does not allow <br />it to seal any other way. <br />The B-1 ffas a cast iron body <br />with a built-in pressure test <br />port.:A shear top constructed of <br />Celcon' acetal copolymer makes. <br />it compatible with all fuels: <br />Both the B-1 set and the- eco- <br />nomically replaceable Celcon' <br />shear top (Model B-IRT)`fit <br />every petroleum dispenser <br />containment system in the <br />market, regardless of brand or --- <br />model. <br />.0 C.- SCLIKE CISPE%'SER <br />A <br />CARB Approrrd 11apar Rr<i,raY <br />Shear Vater. 11a1•rtt Prtt,/lll <br />NhN <br />fi-1 -with Re ph;ceablr Shear Topetnd <br />Support 13rai krt <br />1 <br />Y •.y <br />y <br />Fai <br />rry2J' <br />CARB Approrrd 11apar Rr<i,raY <br />Shear Vater. 11a1•rtt Prtt,/lll <br />NhN <br />fi-1 -with Re ph;ceablr Shear Topetnd <br />Support 13rai krt <br />1 <br />