Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Yosemite 76 #255417 3 <br /> BUSINESS SITE ADDRESS 1700 East Yosemite Avenue t03 CITY Manteca 104, <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing, preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> _(23 CCR§2632,_2634,2638.2641) _ <br /> -------------- --- - - -------------------------------------------------------------------------------------- --------------------------------------------------------------------------------- <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99 OTHER(Specify): 49o-3b <br /> III.MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY-CONTAINMENT S: ® a.DRY E] b,LIQUID FILLED ❑ c.PRESSURIZED C] - ---- <br /> d.UNDER VACUUM--- 49 <br /> 0-6 <br /> ----------------------------------------------------------I----------------------------------------------------------------------------------------------------------- ---------------------------------------------- <br /> -- <br /> 490-7, I <br /> PANEL MANUFACTURER: Veeder Root 1 MODEL#: TLS-350 490-8 <br /> --------------------------4 _9-t------------------- <br /> -------------------------------------------------------490--- <br /> LEAK SENSOR MANUFACTURER: Veeder Root I MODEL#(s): 794380-420 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490.13 <br /> ------------------------------------------------------------------------------------------------------------------------------------------ 4--------------------------------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: 4990-0-1-- EL#(S): 490-1s <br /> ----------------------------------------------------------------------------------------------------------------------------------- -- -- <br /> -- -- -----------MOD------------------------------------------------------------------------------ <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS [Ib.DAILY/NIGHTLY ❑ c.WEEKLY 490.16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------18 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci 490-18 <br /> g.p. g.p.h. (Specify): 490-11 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> F] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS Elb.60 HOURS 410- <br /> _410-12 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23490-24 <br /> 90 23 <br /> TEST FREQUENCY: Ela.ANNUALLY El b.BIENNIALLY El c.OTHER(Specify):S eci 490 24 <br /> 490-2s <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:Na.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-z1 <br /> - - - ----------------------------- - - <br /> PANEL MANUFACTURER: Veeder Root 490 30 MODEL#: TLS-350 490-31 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------I ------------------------------------ - <br /> 490-32 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 1 MODEL#(S): 794380-208 490-33 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES Elb.NO 4e0-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23_CCR j2636)------------------------------------------------------------------------------------------------------- 490-36 <br /> ------------------- <br /> ---- - ------------------------------------------------ - -- - - <br /> MLLD MANUFACTURER(S): Va orless 490-37 MODEL#(S): LD2000 490.38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> --------- 490-40 <br /> -----------------------------------------------------------------------------------------------------------------------------r------------------------------------ --------- <br /> ELLD MANUFACTURER(S) ;-MODEL#(S): <br /> ------------------------------------------------------------------------------------------------------------------------------------------------- ---------- --42 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 h. ❑ 2.MINIMUM ANNUAL 0.1 h. 49042 <br /> g.p. g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES Elb.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES El b.NO 490 44 <br /> [] 4.PIPE INTEGRITY TESTING 490-4s <br /> TEST FREQUENCY ❑ a.ANNUALLY ® b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46 490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> •Allowed for monitori ns of unburied emer ency generator fuel pi ping only per HSC§25281.5(6)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> ' 49051 ---- <br /> 490 52 � <br /> ❑ 99 OTHER(Specify) 490-53 <br /> UPCF UST-D(12/2007) <br />