Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED F'O <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> :.:','.: . •. .;.,•. '.. . : .,.'.:'y :�:.'''�1�P:B�, � XS'I�I+�I�i .. ;•Prt��?l'�f'1V[�'Nx°..(iI1.�'C�;1V1<p. ` <br /> t- UAC MONITORING IS PE"ORMED USING THE FOLLOWING METHOD 490,94. <br /> 1.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY Q 3.ELECTRONIC STAND-ALONE 49o-94n <br /> ®4.NO DISPENSERS ®99.OTHER. S.eci _ <br /> PANEL MANUFACTURER: P/^ _ fl� M� 49ass <br /> Mr EL il: ® 4MA, <br /> ni57" <br /> LEAK SENSOR MANUFACTURER as® MODEL N(S): 9 fl3 L3.. 4 49NO <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a,YES ❑b,NO an-.59 <br /> UDC LEAK ALARM(RIGGERS AUTOMATIC PUMP SHUTDOWN s.YES d b.NO 4 • <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ®b.NO 4 ' <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER, ❑ ar YES ®b.NO 49M7 <br /> 2.UDC CONSTRUCTION IS ®I,SINGLE-WALLED .DOUBLE-WALLED a9aG9 <br /> IF DOUBLE WALLED- <br /> ,MC INTERSTITIAL SPACE IS MONITORED BY: 2.PRESSURE -Q 3.VACUUM <br /> A LEAK WiTHrN THE SECONDARY CONTAINMENT OF THE UTRIGGERS AUDIBLE AND VISUAL ALARMS Q a _Y13S I]b,NO 4"b <br /> •_.:..—'.::.. '....:'.., .! V,,,���r!Wi '.:...� .. .i �ill;Jl4\,�.71r`::!2..;::`:1�:•%q.eu;:m:. .'i'{:','•i :r '�:;.•:;..::•;•".'a'-.'..:,.•.• .r'. :,•.. �! <br /> ELD TF.S MG:THIS FACILITY'HAS BEENNOTIFIEDBY THE SPATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49"5: <br /> LEA ON MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRT .(23 CCR X2644—.1) <br /> 2.SECONDARY CONTAiNP'IENT COMPONENTS ARE TESTED EVERY 36 MONTHS, 490.0 <br /> 3,SPILL BUCKETS ARE TESTED ANNUALLY. 67 <br /> . ....,. :•: . :'. ;.—...M-1.reg:• <br /> The following monitoring/maintenance records arc kept for this facility: <br /> Alarm logs aw.Ga. isual Inspection Records 490-Geb Tank integrity tasting results 4904 <br /> SIR testing results(and ng documentation records). 49a4an Tank gauging results(and supporting documentation records). 4so.0so <br /> ATG Testing results(and supporting documentation records).490,611tQ Corrosion Protection 60-day logs 4sn-sss <br /> uipmcnt maintenance and calibration records. 4h <br /> •... ..'.:5.;.' 4.fr�-h',\^:,.,,,:..,'a.„ft!,Ali.' =���'s �'.4:e P)�t;l.':' d'; 1r�V <br /> ®Personnel with UST monitoring responsibilities arc familiar with all of the following documents relevant to theirjob duties. 49"9. <br /> REFERENCE DOCUMENTS MAINTANED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49"% <br /> AOPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-0e <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49+-69d <br /> [r], CALIFORNIA UNDERGROUND STORAGE TANK LAW 4 <br /> [3 STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION; "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49049f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS”4" <br /> ❑ OTHEk(specify):M6%.WA <br /> Fj This facility has a"Designated UST Operator who has passed the California UST System Operator Exam administered by the International Code Council(TCC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hint,This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the ficility's best management practices <br /> > The ffxility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> Y The facility employee's role with regard to spills and overfills as specifled in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.mn-7n <br /> .®+:A'A—:F67.t'.i :�l,il'a•�'l® :' �•��� <br /> a <br /> Provide additional comments here of indicate many pa with additional information on specific monitoring procedures are attached to this pian,490.71 <br /> �I L/ /9•t <br /> The UST Ownet/Operator is responsible for ensuring that: l)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly, <br /> The following person(s)are responsriale for performing the monitoring and equipment maintenance: <br /> NAME 4anaa TITLE M79 <br /> NAME 490.74 TITLE 490.75 <br /> The Designated Operator shall perform a monthly visual inspection of Ute facility,provide a report to the owner/opetatnr,and inform the owner/operatr of arty <br /> conditions that need follow-up action. <br /> . ;.. "•,_ IdO.WI�t ;'., PER�1a'FaR'�IlfChl�f:4 "J '" <br /> CERTIFICATION:I cern thatt the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICAN 490.f6 DATE: ON77 <br /> APPLICANT <br /> vN,NArM•E 4 "78 APPLIC / 4I(C. d - rg" <br /> UPC(~UST-D(12/2007)3/4 <br />