My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_2007-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 11:52:51 AM
Creation date
6/3/2020 9:49:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2018
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231454_1700 E YOSEMITE_2007-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. RECD JUL 490-2 <br /> deck one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM($- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) Yosemite 76 #255417 _ <br /> BUSINESS SITE ADDRESS 1700 East Yosemite Avenue 103, CITY Manteca I04. <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing, preventive maintenance, and calibration of monitoring equipment(e.g., sensors,probes, line leak detectors, etc.)must be performed at the frequency <br /> specified by the equipment manufacturers' instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> _(23 CCR§2632,_2634:2638,2641)___ _ <br /> - p - ---3a <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(S eci ): 490-3a <br /> 490-3b <br /> III. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/NIAP SUBMITTED WITH THIS PLAN. ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITI-ED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> ® I.CONTINUOUS ELECTRONIC TANK NIONIT 0 R WING OFAIN ULAR(INTERSTITIAL)SPACE(S)OR SECONDARY C0NTA INNIENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARNIS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> 490-7 ! 490-8 <br /> PANEL MANUFACTURER -Veeder Root MODEL#: TLS-350 <br /> --- ------------------------------------- -----t--------------------------------------------------------------------------------- <br /> LEAK SENSOR MANUFACTURER Veeder Root ago 9 ! MODEL#(S). 794380-420 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12 MODEL#: 490-13 <br /> --------------------------------------------------------------------------------------- - - --15 <br /> IN-TANK PROBE MANUFACTURER: <br /> ------------------------------------- <br /> -- <br /> leo-ia MODEL#(S): 490-------------------------------- ---- --------------------- ------- ------------------------- <br /> ---------------- - ----------------------------- <br /> LEAK TEST- -FREQUENCY:- -- -------r-1-- - <br /> a.CONTINUOUS- ---------------------------------------[I -- <br /> b.DAILY/NIG HTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------18 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 g. h. ❑ c.OTHER(S eciqq 490-18 <br /> g.p. p. p `7,) 490-19 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49°•20 <br /> L] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36HOURS [3b.60 HOURS <br /> 490-21 <br /> 90 22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: Ela.ANNUALLY El b.BIENNIALLY El c.OTHER(Specify): 4990-25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUNIP(S)AND OTHER SECONDARY CONTAINNIENT WITH AUDIBLE AND 490.28 <br /> VISUAL ALARNIS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: Na.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM a9o•z9 <br /> -------- --------------------------------------------------------------------------------------------------------------------------- ------ - - <br /> 490-30 -31490 <br /> PANEL MANUFACTURER: Veeder Root MODEL#: TLS-350 <br /> - ----------- - - ----------------------------------------------------------------•------------------------ <br /> 490-32 1490-33 <br /> LEAK SENSOR MANUFACTURER_ Veeder Root _______i MODEL#(S) 794380-208 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490-35 <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(NILLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 490-36 <br /> -------------------------------------------------------------- - --- -(----------- 490-- - <br /> MLLD MANUFACTURER(S): Va orless 490' MODEL#(S): LD2000 490 38 <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> - ---------------------------------------------------------------- - --*----------------------------------------------------------------------- <br /> ELLD MANUFACTURER(S) 490-40 I 440-41 <br /> MODEL#(S): <br /> ----------------------------- ---------------- --- - ----- ---------------------- -- ------ -- ) <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1. MINIMUM MONTHLY 0 2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 4904 <br /> ❑ 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ® b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY [:] a.DAILY [Ib.WEEKLY [-]c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED` 490-49 i <br /> Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 490-52 <br /> ❑ 99 OTHER(Specify) 490-53 <br /> UPCF us"r-D(12/2007) <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.