Laserfiche WebLink
"Mm"— <br /> UNIFIED PROGRAM CONSOLIDATED FORINI <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a490-54b <br /> 1.CONTINUOUS ELECTRONIC MONITORING El 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> 4.NO DISPENSERS El 99.OTHER(Specify): <br /> ------- - -------------------------------------------------------------------------------------- 490-56 <br /> PANEL MANUFACTURER: Veeder Root MODEL#: TLS-350 <br /> ------- ------------------------------------------------------------ - -------- --- ---- ------------------ E LEAK SENSOR MANUFACTURER: Veeder Root 490-58 MODEL 4(s): 794380-208 - <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 0 a. YES 0 b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 0 a. YES D b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 9 a.YES El b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. Z a.YES El b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS Z I.SINGLE-WALLED F1 2.DOUBLE-WALLED 490-63 <br /> ------------- <br /> IF DOUBLE WALLED: 490-64a <br /> UDC INTERSTITIAL SPACE--I-S-MONITORED-BY:---E1_l_._LIQUID----El--2.-PRESSURE---[32,VACUUM ---------------------------------------------------- <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS [1a. YES [1b.N0 <br /> VII.PERIODIC SYSTEM TESTING <br /> —0—1 <br /> ELD TESTING.- THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) <br /> ----------------------------------------------- <br /> -------------------------------------------- <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS ago- <br /> - <br /> 90-----------------------------------®3.SPILL BUCKETS ARE TESTED ANNUALLY. - <br /> 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> 9 Alarm logs 490-6h []Visual Inspection Records 490-68b Ej Tank integrity testing results 490-68c <br /> E]SIR testing results(and supporting documentation records), 490-68d El Tank gauging results(and supporting documentation records). 490-68e <br /> n ATG Testing results(and supporting documentation records).490-68f [:] Corrosion Protection 60-day logs 490-68g <br /> Equipment maintenance and calibration records. 490-68h <br /> IX TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> 0 THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> 0 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69C <br /> El CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> El CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br /> F1 STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> E] SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> (I OTHER(Specify):M69h,M69i <br /> _�This facility has a"Designated LIST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment as specified in this LIST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490.-71 <br /> Overfill Alarm Set at S Be <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained property. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Sunny Bhuller 490-72 TITLE Owner 0-73 <br /> NAME Deepa Rai 490-74 TITLE Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> 1 APPLICANT SIGNATURE 490-76 DATE: 490-77 <br /> 1,:, t.. ..Et,, I 3.Authorized 11 Owner <br /> ?PLICANT NAME(print): 490-78 APPLICANT TI 490-71�1 <br /> Owner <br /> UPCF UST-D(12/2007)2/7 <br />