Laserfiche WebLink
NDE ENVIRONMENTAL CORPORAITON <br />TEST DATE: March 25, 1996 <br />CLIENT: SHELL PRODUCTS COMPANY <br />WORK ORDER NUMBER: 965703 <br />SITE: SHELL 204-6522-0307 <br />TA I .IN ORMAtlOtJ I <br />Tank ID: <br />1 <br />Bottom to top fill in inches: <br />126.0 <br />Product: <br />PREMIUM <br />Bottom to grade fill in inches: <br />133.0 <br />Capacity in gallons: <br />8,000 <br />Fill pipe length in inches: <br />31.0 <br />Diameter in inches: <br />95.00 <br />Fill pipe diameter in inches: <br />4.0 <br />Length in inches: <br />264 <br />Stage I vapor recovery: <br />DUAL <br />Material: <br />STEEL <br />Stage II vapor recovery: <br />BALANCE <br />Tank: <br />NO <br />50 <br />vol change cc: <br />Manifolded Vent: <br />NO <br />0.013 <br />RESULT: <br />WR: <br />YES <br />Test type: PTR -88 <br />Pump type: PRESSURE Pump make <br />Test method: <br />Psi at tank bottom: <br />Fluid level in inches: <br />UFT/OFT <br />Fluid volume in gallons: <br />Water level in inches: <br />Test time: <br />Number of thermisters: <br />Specific gravity: <br />Water table depth in inches: <br />Determined by (method): <br />Leak rate in gph: <br />RESULT: <br />QOMMENTS, .,. , . <br />Test method: <br />Test time: <br />Ullage volume: <br />Ullage pressure: <br />RESULT: <br />DATA FOR UTS-4T ONLY: <br />Time of test 1: <br />Temperature: <br />Flow rate (cfh): <br />Time of test 2: <br />Temperature: <br />Flow rate (cfh): <br />Time of test 3: <br />Temperature: <br />Flow rate (cfh): <br />CC?MMENTS <br />WALL <br />New/passed Failed/replaced <br />detector detector <br />Test method: FTA <br />Make: VAPORLESS <br />Model: LD2000 <br />S/N: 38695 <br />Open time in sec: 3.00 <br />Holding psi: 10 <br />Resiliency cc: 225 <br />est leak rate ml/min: 189.0 <br />Metering psi: 10 <br />Calib. leak in gph: 3.00 <br />RESULT: PASS <br />,.C9MMENTS <br />Material: STEEL <br />Diameter (in): <br />2.0 <br />Length (ft): <br />45.0 <br />Test psi: <br />50 <br />Bleedback cc: <br />45 <br />Test time (min): <br />30 <br />Test 1: start time: <br />15:40 <br />finish psi; <br />47 <br />vol change cc: <br />20 <br />Test 2: start time: <br />15:50 <br />finish psi: <br />49 <br />vol change cc: <br />5 <br />Test 3: start time: <br />16:00 <br />finish psi: <br />50 <br />vol change cc: <br />0 <br />Final gph: <br />0.013 <br />RESULT: <br />PASS <br />Test type: PTR -88 <br />Pump type: PRESSURE Pump make <br />RED JACKET <br />