Laserfiche WebLink
5-16-1996 1 :02PM FROM RHL PETALUMA 7656835 P- 3 <br /> Date- <br /> EMERGENCY RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> Thi*monitor;ng program must be lwpt at the UST Iaoe6on at all tims. 7he infwmation on this nmaitofing Proglra)n are <br /> coaditioaa of the opeming permit. The it holder must notify San Imquin Courly <br /> EnvironyneaW Heft1th Division,phono CZO)40-3420 within 30 days of any Changes to the Menit0rhig <br /> prvot4uxes,unjess requimd to obWn appwval before n-kin.9 the changr- <br /> Required by Sections 2632(d)and 2"1(b)CCR, <br /> Facility <br /> Facility Address 341, ajn SIM9,-Ripo <br /> L If an unauthorized releaw occurs, how will the hazardous substance be clewed up? <br /> Note: If released hazardous substances reach the environment, increase the rue or <br /> explosion h=rd, are not cleaned -up from the secondary cnt within 8 <br /> bours, or deteriorate the secondary Containment, then San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 must be notilled within 24 <br /> hours. For small so L% _QU_LiW gMpnnel will use absorbent materia <br /> _ ft I <br /> released mateTi In a event 1 e soill. the dealer will W1 94-::- 1 <br /> his/W,SMI Regresentative and the Shell Engin= to a&'n in ffiq&mergency,_ <br /> 2. Describe the proposed methods and equipment to be used for mmoving and properly <br /> disposing of any hazardous substances. <br /> ner and dimosodobi ce <br /> with all Local. State. and—Federal laws <br /> he orovided be the resDondine contractor. <br /> 3. Describe the location and availability of the required cleanup equipment in item 2 above. <br /> Ahagrj is mgintained on site and resto-6-ked as needed.. Any,adMfiQA9LMuj:Dment is <br /> ingintained by the contractor, and avail le—on,w,-4Lm&dQdj&9L- <br /> 4. Describe the maintenance schedule for the cleanup equipment. <br /> Ahscar bmt is inspected mLeekly and Leqrdgred,aspeeded. <br /> 5. List the name(s) and fitle(s) of the person(s) responsible for authorizing any work <br /> necassaq under the response plan: <br /> Dave Posey/_ Station, <br /> Jeff Granbf-= I Shell Proiect Engineer <br /> Jeff <br /> ram .1 1 <br /> "hell Di trict Enaineer Ev <br /> Dan Kirk t Shdl Environmental Engineer <br />