My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 4:42:40 PM
Creation date
6/3/2020 9:50:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231477_341 E MAIN_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICtEALTH SERNPICES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION <br />Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer <br />445 N. San Joaquin Street • P.O. Box 388 • Stockton, CA 95201-0388 <br />(209) 468-3420 <br />TO: INSTALLERS AND OWNERS OF NEW UNDERGROUND STORAGE TANKS <br />San Joaquin County Public Health Services -Environmental Health Division (PHS-EHD) has established the <br />following guidelines to assist you in the completion of your construction project. The guidelines specify the <br />construction and monitoring criteria necessary to complete our review of your proposed underground storage <br />tank (UST) system. <br />1. SUBMITTAL OF PLANS <br />a. Submit 3 complete sets of detailed drawings in non -erasable print to the Environmental <br />Health Division. Upon approval, one set will be retained by the department and the other <br />two will be returned. <br />b. Include equipment and material specification sheets and manufacturer's brochures describing <br />operating and monitoring systems and listing numbers or other evidence of a nationally <br />recognized testing organization approval. <br />C. Include detailed monitoring and response plans for facility. <br />d. The drawn to scale plot plan should illustrate the location of all existing and proposed <br />structures, including existing UST(s). <br />e. The plans should include a cross sectional diagram of the tank and piping system including <br />secondary containment, overflow protection equipment, and extension of all pipes and/or <br />ports from subgrade to finish grade. <br />2. PLAN REVIEW AND OPERATING PERMIT FEES <br />a. New facility pian review fee of $624.00 (8 hour minimum per facility), $170.00 fee per tank, <br />plus $56.00 state surcharge fee per tank is due at time of plan submittal. <br />b. New installation of additional tank at an existing facility is $624.00 plan review fee (8 hour <br />minimum per facility) plus $170.00 fee per new tank, and $56.00 per tank state surcharge fee. <br />C. It should be noted that a $624.00 plan review check fee required for each submittal allows <br />for up to eight (8) hours of staff review and/or inspection time. Additional time spent on <br />plan review, meetings, inspections, phone or office consultations will be billed to the <br />applicant at a rate of $78.00 per hour. <br />d. The maximum review time for UST installation plans is 40 working days. A preliminary <br />review will be conducted by the PHS/EHD within 20 working days of submittal date to <br />identify any gross plan deficiencies. <br />e. If gross deficiencies are identified, the plans will be returned with checklist identifying plan <br />deficiencies. <br />f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br />submitted to have review completed within 10 working days of submittal date. <br />A Division of San Joaquin Clunty Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.