Laserfiche WebLink
f� E. Other types of tanks. <br />(1) Chemical composition of material stored is provided. <br />(2) Chemical abstract service number (CAS#) <br />14. Overflow protection systems (detail drawing of spill catchment basin(s)/piping sump(s) required, including tank fill and all <br />openings). <br />[Section 2635 (b) (8)] <br />A. <br />Spill catchment basin. <br />YN <br />Capacity: / <br />A <br />Type: L r'?, L <br />B. <br />Manual monitoring (motor vehicle fuels only). <br />_ <br />_ (1) Written fitting procedure: [Section 2635 (9) (A) (B) (C)] <br />_ (a) Tank volume capacity is at 103% or +200 gallons. <br />(b) Metered product entering UST and tank capacity <br />determined immediately prior to filling. <br />C. <br />Mechanical/Electronic monitoring (mandatory for non -motor vehicle fuel tanks) [Section 2635 (8) (A) (B) (C)] <br />(1) Level sensing device and #2 or #3 below. <br />(2) Audibte/visual alarm triggered by a liquid level sensor. <br />X (3) Automatic shut-off. <br />15. Double <br />-walled tank and system allow for monitoring of the annular space. <br />[Section <br />2635 <br />(8) (A) (B) (C)] <br />_ <br />A. <br />Release from 10 container designed to drain to a specific location within the arvwlar space to be detected by <br />a monitoring device or method. <br />A— <br />B. <br />Continuous electronic monitoring connected to audible/visual alarm system. <br />i< <br />C. <br />Type of Detectors (Detail of monitoring equipment as installed). <br />(1) Brand Name: V!fT �'Y� <br />(2) Model Number: TL -S <br />X (3) Sensor Type: _ Vapor Liquid both. <br />(4) Sensor Specification. <br />(5) Brochures provided. <br />(6) Manufacturer's written installation instructions. <br />(7) Location of probe for: <br />(tank): (piping): <br />16. <br />Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or double- <br />wall <br />UST. [Section 2631 (r)] <br />A. Approved by a nationally recognized independent testing organization. <br />B. Demonstration of integrity with the 10 tank or double walled UST. <br />17. <br />Tanks subject to floatation. [Section 2631 (s)] <br />XA. <br />Anchored by deadman or stab. <br />B. Anchors to be installed as specified by manufacturer. <br />XC. <br />Installation details provided on plans. <br />K <br />D. Calculations provided. <br />18. 1L <br />Fiber liners between tank(s) and excavation to prevent infiltration of native soil into backfill material. <br />Qr2�� 10,—, � <br />5 <br />