Laserfiche WebLink
NEW USTO NITALLATION INSPECTION REC*-) <br />3. <br />INITIAL INSPECTIONS <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />VACUUM: SOAP: PSI: NRS/MIN: <br />PRIMARY TANK TEST: PSI: 4. <br />Lo <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br />PIPING INSPECTIONS <br />HOLIDAY: <br />BRIM E(LIQUID ): OTHER: <br />HRS/NIM: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />A <br />I <br />p• • a 1r <br />" ♦r n CONTAINMENT ... • ia• <br />r <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />5 <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />. <br />R <br />T <br />01110FIX <br />,•. r.. ♦• • • r.. • .. •..: ��. <br />0 <br />I <br />(CCR 2635 (3) (6)) <br />V <br />A <br />(CCR 2635 (E) (2)) <br />E <br />L <br />(CCR 2631 CD) (5)) <br />D <br />S <br />(CCR 2635 (A) (5)) <br />ky20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />21. <br />'CC FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />22. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />V/ LAI <br />23. <br />ALL CONDITIONS NET; FACILITY PERMIT ISSUED <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />3. <br />INITIAL INSPECTIONS <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: <br />VACUUM: SOAP: PSI: NRS/MIN: <br />PRIMARY TANK TEST: PSI: 4. <br />Lo <br />TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL <br />PIPING INSPECTIONS <br />HOLIDAY: <br />BRIM E(LIQUID ): OTHER: <br />HRS/NIM: <br />(CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />FINAL INSPECTION <br />hAl <br />Y, <br />PERFORMANCE TEST FOR 'ALL' MONITORING PROBES <br />p• • a 1r <br />" ♦r n CONTAINMENT ... • ia• <br />r <br />rr• 2635 <br />um <br />(CCR 2632 (A) (2)) <br />5 <br />.. V .r �� • <br />� t q�.3f i'. • • 7 '. PL `. �I F. r• . ,. •. • .. f 7Y <br />rr' �. <br />. <br />15. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />01110FIX <br />,•. r.. ♦• • • r.. • .. •..: ��. <br />»•. S :: <br />FINAL INSPECTION <br />hAl <br />12. <br />PERFORMANCE TEST FOR 'ALL' MONITORING PROBES <br />(CCR 2632 CC) (2)) <br />13. <br />PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br />(CCR 2632 (A) (2)) <br />5 <br />14. <br />PERFORMANCE TEST OF LINE LEAK DETECTION <br />(CCR 2632 CD) 2635 (B) (5)) <br />l0 <br />15. <br />PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br />(CCR 2635 (8) C5)) <br />¢5 <br />16. <br />BALL FLOAT VALVES INSTALLED <br />(CCR 2635 (3) (6)) <br />17. <br />OVERFILL PROTECTION INSTALLED/ <br />(CCR 2635 (E) (2)) <br />18. <br />TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND YATERTIGHT) <br />(CCR 2631 CD) (5)) <br />19. <br />TANK INTEGRITY TEST (PASSING HARD COPT) <br />(CCR 2635 (A) (5)) <br />ky20. <br />MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE <br />(CCR 2632 (E) (1) (2)) <br />21. <br />'CC FORM COMPLETED AND SUBMITTED <br />(CCR 2635 (E)) <br />22. <br />MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED <br />(CCR 2641-2644) <br />V/ LAI <br />23. <br />ALL CONDITIONS NET; FACILITY PERMIT ISSUED <br />(H+S CODE 25284 (E) (F)) <br />COMMENTS: <br />EH23-106 3/92 (REVISED 11\92) <br />