Laserfiche WebLink
Monitoring System Certification <br /> D. Results of Testing/Servicing <br /> Software Version Installed: AS3E5oC <br /> Coma lets the following cbecklist: <br /> 9 Yes ❑ No* Is the audible alarm operational? <br /> IS Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually inspected,fimctionally tested,and confirmed operational? <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ 'Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modern) <br /> ® N/A, operational? <br /> 0 Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) ®Sump/Trench Sensors; 19 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ® Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> [j N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and opeaating properly? If so,at what percent of tank capacity does the alarm trigger? 80% <br /> Q Yes* 0 No Was any monitoring equipment replaced? If yes,identify specific sensors.,probes,or other equipment replaced <br /> and list the manufacturer, name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Ycs ❑ No* Is all monitoring equipment operational per eturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. <br /> Comments: <br /> Page 2 of 3 <br />