My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_2010-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 3:25:18 PM
Creation date
6/3/2020 9:50:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2014
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231497_1097 YOSEMITE_2010-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
487
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[1 <br />outside diameter of the piping being installed with a required <br />minimum of 2" (50 mm) of separation for all piping. Trench <br />turns should be sweeping rather than sharp angles. The <br />bottom of the trench should be compacted and as uniform as <br />possible to eliminate high spots to insure an even layer of <br />bedding material under the pipe. Remove all sharp rocks and <br />debris from the trench bottom before bedding material is <br />installed. <br />8.2 Bedding & Backfill Materials <br />Approved bedding and backfill materials for <br />OPW-FCS's flexible piping, sumps and <br />Access piping shall meet the following <br />specifications: <br />8.2.1 Pea Gravel <br />Rounded pea gravel is permitted with a minimum diameter <br />of 1/8" and a maximum diameter of 3/4". <br />8.2.2 Crushed Stone <br />Crushed stone is permitted providing it shall be washed <br />clean and be of the free flowing type with an angular stone <br />size between 1/8" and 1/2". (Meets ASTM C-33 paragraph 9.1 <br />requirements.) <br />8.2.3 Sand <br />Sand backfill is permitted providing it shall be washed clean <br />and is free flowing with a maximum content of 10% fines. <br />When backfilling, make sure sand is evenly distributed and <br />fully compacted under and fully around the piping. <br />NOTE: A minimum of 6" (152mm) of approved bedding <br />material shall be spread and compacted evenly along <br />the bottom of the piping trench. All bedding and backfill <br />material should be clean and free from ice and snow and <br />debris. Using material other than those described above <br />without written approval from OPW-FCS Products Inc. <br />will void the product warranty. <br />8.3 Flexible Pipe Sloping <br />If a continuous slope or "fall" is required from the last <br />dispenser on a piping run to the tank, then the tanks should <br />be buried at a sufficient depth and the pipe entry height into <br />the dispenser sump should be of sufficient elevation so that <br />1/8" of fall per linear foot is maintained. OPW-FCS does not <br />require its flexible pipe to be sloped in pressure systems. <br />8.3.1 Pressure Piping Systems <br />If the full system warranty is desired, the difference in <br />elevation of the piping between two dispenser sumps must <br />not be greater than 30". A pipe sensor must also be placed <br />the terminating dispenser sump or tank sump, whichever is <br />a lower elevation. <br />NOTE: Check your local code regulations for fall <br />requirements other than that which is previously stated. <br />8.3.2 Suction Piping Systems <br />Sloping the OPW-FCS flexible piping from the dispenser back <br />to the tank is always required for suction piping systems <br />where maintaining prime is necessary. Shallow dispenser <br />sumps are recommended for use in this application. <br />L' <br />Fle�-,,.WORKS <br />8Y OAM FUELING CONTAINMENT SYSTEMS <br />8.4 Pipe Trench Backfilling <br />Backfilling of the flexible Piping System should occur <br />only after the final integrity testing has been performed <br />on both the primary and the secondary of the pipe. Prior <br />to backfilling completely, hand shovel the backfill material <br />between and to the outside of the pipe to maintain the <br />minimum required spacing between the pipes and walls <br />of the trench. Final backfilling shall be done slowly and <br />evenly in 4" to 6" layers as not to disturb the spacing of the <br />pipe and to insure no voids are present in the backfill. An <br />additional air test is recommended after backfilling to insure <br />the backfill process has not damaged the pipe. <br />NOTE: Use extra caution when backfilling around direct <br />bury coax fittings. Avoid sharp impacts from backfill <br />material and tools. <br />8.5 Overburden <br />The type of surface installed above the piping can have <br />an overloading effect on the flexible piping. Follow the <br />overburden specifications below for product warranty <br />compliance. <br />CAUTION: FlexWorks piping and Access piping can be <br />punctured by grade stakes or other sharp objects driven <br />into the ground. The use of tracer tape or a schematic of <br />the underground piping should be kept onsite and <br />marked off prior to commencing any work that may <br />damage the pipe. <br />8.5.1 Unpaved Surfaces <br />If the surface is unpaved, then a minimum of 18" (457mm) of <br />approved backfill material should be installed between the top <br />of all flexible piping and the top of the ground surface. <br />8.5.2 Paved Surfaces <br />If the surface is paved with either asphalt or concrete the <br />total amount of pavement plus approved backfill material <br />shall be a minimum of 18" (457mm) between the top of <br />either the flexible piping and the top of the paved surface. <br />8.5.3 Access Pipe Burial <br />Whether the surface is paved or unpaved with either <br />asphalt or concrete then there shall be a minimum of 16" <br />(406mm) between the top of the Access Pipe and the top of <br />the paved or unpaved surface. <br />9.0 FLEX PIPING OPTIONS <br />The OPW-FCS's Piping Systems offers several types of pipe <br />coupling options. These options, in turn, allow for a variety of <br />piping application -options for the flexible pipe used in both <br />pressure piping systems and suction piping systems. <br />9.1 Pipe Coupling Options <br />There are two types of pipe coupling options available for the <br />OPW--FCS's flexible piping system. The first is coax couplings, <br />which are a double wall non-metallic pipe coupling that can be <br />used with both OPW-FCS's single wall and double wall piping. <br />The second is swivel couplings, which are made of stainless <br />steel. Both are internally expanded onto the OPW-FCS's <br />flexible piping using the FlexWorks coupling machine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.