My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_2010-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 3:25:18 PM
Creation date
6/3/2020 9:50:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2014
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231497_1097 YOSEMITE_2010-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
487
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fitting/pipe coupling connection. Please follow the steps <br />noted below: <br />® Install the stabilizer bars in their proper position, per <br />OPW FCS Stabilizer Bar Installation Instructions, which <br />can be determined by the dispenser manufacturer's <br />footprint for the particular dispenser model. This will allow <br />for proper vertical alignment. <br />Install the shear valve to the shear valve mounting plate <br />and secure this to the stabilizer bar in accordance with <br />the dispenser manufacturer's footprint. <br />Install the entry boots in accordance with the OPW-FCS <br />Flexible Entry Boot installation instructions. <br />• Line up the center of the entry boot with the center of the <br />opening of the tee, elbow or adapter. <br />• Determine the length of the steel riser by measuring <br />between the bottom of the shear valve and the top of the <br />tee, then add 1-1/2" to that length prior to cutting the NPT <br />threads for each end of the riser. <br />• Install the riser to the top of the shear valve with the use <br />of soft set pipe dope that is approved for use with <br />petroleum products. <br />• Install the tee, elbow or adapter to the bottom of the riser, <br />positioning it properly to align with the entry boot <br />horizontally, with the use of soft set pipe dope that is <br />approved for use with petroleum products. <br />• Reinstall the riser set up to the stabilizer bar and then <br />make sure that the tee, elbow or adapter opening is on <br />center with the entry boot opening on both the horizontal <br />and vertical plane. <br />• Assure that the opening of the tees, elbows or adapters <br />are all on center with the entry boot, on both the <br />horizontal and vertical plane. <br />12.2 Non -Contained Riser Pipe <br />Non -contained riser pipe assemblies are only permitted if <br />they are to be installed inside dispenser sumps. These riser <br />pipes assemblies may have a coax or swivel fitting installed <br />at the base of the steel riser pipe. <br />13.0 FLEXIBLE PIPE FABRICATION <br />After all plumbing trees have been installed inside the tank <br />sumps and riser assemblies installed into either the deep or <br />shallow dispenser sumps, fabrication and installation of the - ---.--- <br />flexible piping may proceed. <br />IMPORTANT. Only currently certified contractors with <br />a valid factory training card are authorized to install Flex <br />piping. <br />13.1 Pipe Handling At Jobsite <br />Care must always be taken when handling OPW-FCS's <br />flexible piping to prevent damage. It is recommended that <br />the carton be placed in the sunlight several hours before <br />measuring and cutting the pipe, so the pipe may relax for <br />easier extension when measuring. <br />11 <br />11 <br />FheAWOORKS <br />BY GPIN FUELING CONTAINMENT SYSTEMS <br />WARNING:drag,or ;« pipe during <br />13.2 Cold Weather Pipe Handling <br />OPW-FCS's flexible piping can be installed in ambient <br />temperatures as low as zero degrees, provided that the <br />flexible piping has been sufficiently <br />warmed prior to unrolling. If the pipe <br />is unrolled and straightened while it is <br />warm, it will cool in a straighter <br />position making it easier to install. For <br />cold weather installations where the <br />ambient temperature is below 400 F <br />(50 C), it is recommended that the <br />piping cartons be placed in a warm <br />room for 8 hours directly prior to <br />installation. If this is not possible, then a small hole should be <br />cut in the top center of the lid of the carton for insertion of the <br />nozzle of a conventional hair dryer. For piping reels, place a <br />tarp over the reel and then insert the hair dryer nozzle <br />directly into the end of the piping. If this pipe warming <br />procedure is used, do not use the first 12" of the pipe due to <br />possible damage by the hair dryer. Depending on the <br />ambient temperature, it may take up to an hour to warm the <br />roll of piping sufficiently. <br />13.3 Flexible Pipe Measuring <br />When measuring the distance between containment <br />sumps or pans to determine the proper length of a flexible <br />pipe section to be installed, it is important to consider <br />that the pipe is flexible and will not be installed perfectly <br />straight. A slight weaving of the pipe in the piping trench is <br />recommended to compensate for expansion and contraction. <br />The recommended measuring and cutting procedures for the <br />flexible piping are described below: <br />13.3.1 Direct Pipe Burial Applications <br />When measuring for direct burial of flexible piping, the <br />measuring points will be from the face of one adapter/ <br />fitting to the next. If swivel couplings and fittings are used, <br />subtract 1" to allow for the length of the two pipe couplings <br />and cut the piping to that length. For coax application, no <br />modification to the measurement is necessary. <br />13.3.2 Access Pipe Burial Applications <br />For Applications using Access Pipe, measurements <br />must be taken through the Access Pipe to insure proper <br />length. Feed the measuring tape through the Access Pipe <br />and measure the distance from the face of the one adapter/ <br />fitting to the next. If swivel couplings and fittings are used, <br />subtract 1" to allow for the length of the two pipe couplings <br />and cut the piping to that length. For coax application, no <br />modification to the measurement is necessary. See Access <br />Pipe installation instructions for complete information and <br />installation steps. <br />13.4 Flex Pipe Cutting <br />When cutting the piping into pipe sections, cut the pipe <br />at the measured cut mark using the pipe cutter tool. This <br />cutting tool is designed to make clean and even cuts in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.