Laserfiche WebLink
rA <br />26.2.3 Corrosion Resistance <br />The flexible underground piping and associated <br />couplings, fittings and adapters which come in contact <br />with the ground environment shall be made of non-metallic <br />material or encapsulated by non-metallic components <br />which prevent corrosion. <br />26.2.4 Structural Integrity <br />The flexible underground piping and associated couplings, <br />fittings and adapters shall be designed and constructed of <br />materials strong enough for its intended use. The flexible <br />piping shall not collapse, crack or break due to ground <br />movement or from backfill and high ground water pres- <br />sures. Piping shall be able to transfer fluid up to a <br />maximum temperature of 125 degrees fahrenheit (52 <br />degrees celsius). Piping shall be operational with in a <br />temperature band of minus 40C and +65C. <br />26.2.6 Bend Radius <br />The double wall flexible piping shall be capable of a min- <br />imum bend radius without kinking, cracking or breaking. <br />The minimum bend radii shall be equal to or less than the <br />following: <br />0.75" - 18" radius <br />1.0" - 18" radius <br />1.5" - 24" radius <br />2.0" - 36" radius <br />3.0" - 48" radius <br />26.2.6 Fluid Flow Efficiency <br />Both the primary inner and secondary outer pipe shall have <br />an interior surface which is a smooth (non -corrugated) profile <br />and be made of a low friction resistant material for improved <br />fluid flow efficiency. <br />26.2.7 Operating Pressures & Vacuums <br />The flexible underground piping shall have a minimum five <br />to one (5:1) safety factor from maximum operating pressure <br />for rated pressure. The maximum operating pressure rating <br />for 1.5" diameter piping shall be 100 psi primary and 10 psi <br />secondary. 3/4", 1", 2" and 3" piping shall be rated at a <br />maximum operating pressure of 75 psi primary and 10 psi <br />secondary. For suction systems the pipe shall be capable <br />of withstanding 29" mercury vacuum. <br />26.2.8 Pipe Expansion <br />The primary supply pipe shall not expand more than .0025% <br />in diameter and overall length when pressurized to 60 psi <br />to permit accurate pressure decay readings by an in-line <br />leak detector. <br />-- -- - -- - - 26.2.9 Interstitial Interconnection <br />All primary and secondary piping shall be connected <br />in such a way as to permit integrity testing both during <br />installation and at periodic intervals in the future. Both <br />primary and secondary piping shall remain continuous <br />during operation. <br />26.2.10 UL® Testing <br />Both the primary and secondary piping and their <br />associated fittings shall be independently tested in <br />accordance with UL 971. <br />20 <br />Fle.XWOO RKS <br />3V OPS FUELING CONTAINMENT 5YSTEM3 <br />21M, Storage and Handling <br />27.1 Storage <br />OPW--FCS requires that all piping, fittings and system <br />components be stored in such a manner that they <br />will not be subject to direct sunlight and / or excessive <br />environmental conditions. Please review the below <br />noted warnings during product storage. <br />• Cover all products with UV protective tarps if outside. <br />• If tarps are unavailable, store in trailer or building until <br />use. <br />27.2 Handling <br />OPW-FCS requires that the piping, fittings and system <br />components are handled in such a manner that it will not <br />cause unnecessary damage to the system components. <br />Please review the below noted warnings during product <br />handling. <br />• Do not drop, cut or impact the components. <br />• Keep all piping, fittings and components in the original <br />packaging until ready to use. <br />• Keep all thread protectors secure until ready to use. <br />• Keep all coupling protector caps / covers in place. <br />• DO NOT drag, cut or scrape pipe. <br />• Upon completion of pipe, inspect for cuts, scrapes and <br />damage prior to close of pipe runs. <br />• DO NOT exceed 15° angle entry for pipe into a sump. <br />Please visit our website, www.opwfcs.com, for a <br />detailed guide specification. <br />