Laserfiche WebLink
Page 1 of 1 <br />Muniappa Naidu[EH] 0 0 <br />From: Muniappa Naidu [EH] <br />Sent: Friday, September 09, 2011 4:06 PM <br />To: 'richard@franzen-hill.com' <br />Cc: Michelle Henry [EH] <br />Subject: 1097 Yosemite Avenue, Escalon <br />Reviewed the set of plan and document submitted on 9/2/11. The plan is lacking the following information: <br />1. It was stated that existing penetrations will be used. Are the existing penetration compatible with the piping used - need <br />approval from manufacturer. <br />2. Provide length of piping information for leak detector performance. <br />3. Which laboratory will be used for analytical. <br />4. Page #1 of the UST retrofit is not signed by the owner under billing information, who will be responsible for the payment <br />of time billed beyond the permit fees. <br />5. How will the existing product piping be disposed. <br />6. Will concrete be broken during construction. <br />7. What method of sampling will be used. <br />I will be in training for next two weeks. Please contact Michelle Henry for the next two weeks. <br />Thanks <br />Muniappa Raidu <br />Senior <br />San Joaquin County <br />i �`•.QAt <br />• f <br />Stockton,0 <br />0 <br />9 468-3439 <br />9/28/2011 <br />