Laserfiche WebLink
San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />a: <br />Stockton, California 95205-6232 <br />cq��FOR�'�P Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />January 22, 2016 <br />Andrew Flores <br />Franzen Hill Corp <br />1100 North J Street <br />Tulare; CA 93274 <br />Re: Escalon Mini Mart, 1097 E Yosemite Ave, Escalon <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Adrienne Ellsaesser, REHS <br />Rodney Estrada, REHS <br />Willy Ng, REHS <br />8 <br />FILE COPY <br />SR0074051 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace the 87 and 91 spill direct bury spill containers and the 91 <br />turbine sump liquid sensor on the underground storage tank (UST) system at the above noted <br />address. The permit has been approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Garrett Backus at (209) 468-2986 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. <br />b. Corrosion protection: Verify corrosion protection for direct bury spill bucket prior to <br />backfilling (inspection only applies if concrete is broken and pea gravel is excavated). <br />c. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br />test (or equivalent). Proper drainage must also be verified. <br />Please be aware that the facility cannot receive fuel in the 87 or 91 tank prior to <br />the EHD inspection and approval. <br />4. If concrete will be broken near the UST, a secondary containment test must be <br />performed on the UST once concrete is poured in accordance with the manufacturer's <br />guidelines. <br />