My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1097
>
2300 - Underground Storage Tank Program
>
PR0231497
>
COMPLIANCE INFO_2015-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 2:05:16 PM
Creation date
6/3/2020 9:50:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2019
RECORD_ID
PR0231497
PE
2361
FACILITY_ID
FA0000279
FACILITY_NAME
ESCALON MINI MART
STREET_NUMBER
1097
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
ESCALON
Zip
95320
APN
22510001
CURRENT_STATUS
01
SITE_LOCATION
1097 YOSEMITE AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231497_1097 YOSEMITE_2015-2019.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />.1 <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 JAN 2016 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />ENVIRONMENTAL <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPEMON WpOWENT <br />Facility Name: Inspection Date: <br />Escalon Naini mart Wednesday, January 27, 2016 <br />Facility Address: Service Request 9: <br />1097 E. Yosemite Ave., Escalon SR0074051 <br />Onsite Service Technician's Name:ICC Service Technicianlinstaller Exp. Date: Manufacturer Training: <br />Jose Ochoa 11/12/18Incon 2/10/17 <br />SERVICE <br />SERVICE <br />Leak detector <br />❑ ❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ Caldwell System ❑ Other <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />® 1 hour hydrostatic ❑ Incon TS -STS <br />❑ electronic Serial #: <br />❑ Caldwell System ❑ Other <br />❑ line test programmed <br />Primary <br />Primary piping testing at: <br />91 STP sensor <br />® <br />0 positive shutdown Model Incon <br />minutes <br />❑ fail safe Serial #: TSP-ULS <br />Secondary containment testing for: <br />❑ NA <br />UDC(s) Piping <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />Testing for the above components are next due by: <br />❑ fail safe Serial : <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ NA <br />Cold start of monitoring panel <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />Other: see below <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95%6 <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />® This UST facility is APPROVED to operate <br />❑ This UST facility is NOT APPROVED to operate <br />#n site to witness testing of sensor functionality for 91 STP sensor, one hour testing of 87 and 91 sp-41 <br />buckets and verify minimum of 5 -gallon capacity and proper drainage. All passed. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT A Y TIME AT END'S CURRENT HOURLY RATE. <br />EHD Inspector: (y ,VA I ` 0 Received By: s Title: <br />EHD 23-04 Rev. 04/19/12 UST SERVICE REQUEST INSPECTION REPORT <br />87 Spill bucket El minimum 5 gallon <br />N <br />El 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />97 Spill bucket ® minimum 5 gallon <br />® <br />® 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary <br />Primary piping testing at: <br />El <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />#n site to witness testing of sensor functionality for 91 STP sensor, one hour testing of 87 and 91 sp-41 <br />buckets and verify minimum of 5 -gallon capacity and proper drainage. All passed. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT A Y TIME AT END'S CURRENT HOURLY RATE. <br />EHD Inspector: (y ,VA I ` 0 Received By: s Title: <br />EHD 23-04 Rev. 04/19/12 UST SERVICE REQUEST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.