My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 1:11:04 PM
Creation date
6/3/2020 9:50:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A KNOLOG <br />TECHNOLOGY FOR TANKS <br />AND THEIR ENVIRONMENT <br />Owner B. P. C I L <br />Invoice Name/Address B. P <br />Site Name/Address B . P <br />VacuTectTm TEST REPORT <br />S.O. # <br />i V1R0' ,- ;' t HFA <br />Site # 11195 -i"'tj; <br />OIL 2868 PROSPECT PARK DR. ST SUITE 360 RANCHO CORDOVA, CAg;' Wil396FM02:2 (hone <br />Attn: <br />OIL 16500 LOUISE LATHROP! CA <br />084044 <br />05/05/03 <br /><916> 631-6915 <br />LOUIS PARISI <br />TANKS <br />LINES <br />Leak Det <br />See <br />Dia g' <br />For <br />c' <br /># <br />Tank <br />Product <br />Tank <br />Capacity <br />Tank <br />Dia. & <br />Material <br />ST/ <br />FRP/ <br />Lined <br />Dipped <br />Water <br />Level <br />■ <br />START <br />END <br />Dipped Probe <br />Product Water <br />Level Level <br />■ ■ <br />START START <br />END END <br />Water <br />Ingress <br />Detected <br />■ <br />Yes/No <br />Bubble <br />Ingress <br />Detected <br />■ <br />Yes/No <br />Ullage <br />Air <br />Ingress TANK <br />Detected ■ <br />■ Tight <br />or <br />Yes/No Fail <br />Line # <br />Line <br />Material <br />■ <br />ST/ <br />FRP <br />Line <br />Delivery <br />Syst. Type <br />■ <br />PS/SS/GS <br />LINE <br />TEST <br />■ <br />START <br />TIME <br />LINE <br />TEST <br />■ <br />END <br />TIME <br />Final <br />Leak <br />Rate <br />■ <br />GPH <br />LINE <br />■ <br />Tight <br />or <br />Fail <br />Exist <br />LD(s) <br />Pass/ <br />Fail/ <br />or <br />NONE <br />NEW <br />LD(s) <br />Tested <br />& <br />PASS <br />TANKS and LINES Tested to CFR -40 Parts <br />280-281 & NFPA 329 Specs. <br />Other: <br />1 <br />11 <br />S U P R <br />6000 <br />iameter <br />p <br />tJ <br />Exist LD SN/MDL/MFG: <br />U N L <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI <br />Materialrcent <br />o ill at <br />Start Time: Time of Test: <br />•an <br />Pump <br />Mf .. <br />p <br />Dispenser Shear Valves <br />Operate es/no <br />r0 be Inclinometer <br />End Time: T PSI:r Decr <br />Diameter <br />Exist LD SN/MDL/MFG: <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI <br />aterial <br />ercent o t at ump <br />Start Time: Time of Test: Mfg.: <br />Dispenser Shear valves <br />Operate es/no <br />an robe Inclinometer <br />End Time: Test PSI: Entry: De Tees: <br />ameter <br />Exist LD SN/MDL/MFG: <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI <br />atena <br />rcant o ill at ump <br />Start Time: Time of Test: Mfg.; <br />shear, valves <br />O erste es/no <br />an roe Inclinometerr <br />En Tim Test PSI: Entry: D r <br />Diameter <br />Exist LD SN/MDL/MFG: <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI <br />stens <br />ercent o ill at ump <br />Start Time: Time of Test: Mfg.: <br />Tank robe Inclinometer <br />End Time: Test PSI: Entry: Dear <br />Dispenser Shear Valves <br />Operate es/no <br />Diameter <br />Exist LD SN/MDL/MFG: <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI: <br />-Uafa-a7 <br />rcent o ill at Hump <br />Start Time: Time of Test: Mfg.: <br />Dispenser Shear Valves <br />Operate es/no <br />an robe Inclinometer <br />End Time, Test PSI: Ent : Dear <br />Diameter <br />Exist LD SN/MDL/MFG: <br />New/2nd LD SN/MDL/MFG: <br />LINE TEST PSI: <br />-ga—tanr <br />ercent of Fillat ump <br />Start Time: Time of Test: Mfg.: <br />Dispenser Shear Valves <br />o erste es/no <br />Tank robe Inclinometer <br />End Tim : Test PSI: Entry: De rees: <br />13 <br />TANKNOLOGY Region: WESTERN REGION Unit # 037 State Lic. # <br />NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. <br />TAK-01 <br />Tanknology Corporation International <br />State: ti= -A 5225 Hollister St., Houston, TX 77040 <br />(800) 888-8563 9 FAX (713) 690-2255 <br />
The URL can be used to link to this page
Your browser does not support the video tag.