My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 4:00:13 PM
Creation date
6/3/2020 9:50:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> G SYSTEM CEA <br /> PiFICATIN <br /> For Use By All Jurisdictions Within the State of California <br /> Authority Cited: Chapter 6.7,Health and Safety Code,Chapter 16,Division 3, Title 23, California Code of Regulations <br /> This form must be used to document testing and servicing of monitoring equipment. If more than one <br /> monitoring system control panel is installed at the facility, a separate certification or report must be prepared for <br /> each monitoring system control panel by the technician who performs the work. A copy of this form must be <br /> provided to the tank system owner/operator. The owner/operator must submit a copy of this form to the local <br /> agency regulating UST systems within 30 days of test date. Instructions are printed on the back of this page. <br /> A. General Information <br /> FacilityName: IRC.Atj ��,,J 'R8 bta.S Bldg.No.: <br /> Site Address 1 -0 S00 Uoox, i& Cit':1_� �-��--0,f� zip:T0- o3nS <br /> Facility Contact Person: P- I e K fj1 Contact Phone No.: <br /> Make/Model of Monitoring System:VeenAe!-gaOT T'k,5'S5 d toe I gJULOnq Date of Testing/Servicing: is h/25V_ <br /> B. Inventory of Equipment Tested/Certified <br /> Check the appropriate boxes to indicate specific equipment inspected/serviced: <br /> Tank ID: %3 Tank ID: 9? <br /> �V-Tank Gauging Probe. Model: M ar, 1 Tank Gauging Probe. Model:Mei , <br /> nnular Space or Vault Sensor. Model:401% 0Innular Space or Vault Sensor. Model: �Ab <br /> iping Sump/Trench Sensor(s). Model:JO'R G Piping Sump/Trench Sensor(s). Model:a n!z <br /> ❑ Fill Sump Sensor(s). Model: ❑ KI Sump Sensor(s). Model: <br /> U-Mechanical Line Leak Detector. Model:Pee Gr Mechanical Line Leak Detector. Model: R9A%j tCYj:A <br /> ❑ El ctronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> ta'Tank Overfill/High-Level Sensor. Model: p Z2 t_A) _ [F'l'ank Overfill/High-Level Sensor. Model: 0 ?U3 <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> ER"Shear Valve(s). 13KS-hear Valve(s). <br /> G 'bispenser Containment Float(s)and Chain(s). (11116ispenser Containment Float(s)and Chain(s). <br /> ❑ Other(specify equipment type and model in Section E on Page 2). O Other(specify equipment type and model in Section E on Page 2). <br /> Tank ID: Tank ID: <br /> ❑ In-Tank Gauging Probe. Model: ❑ In-Tank Gauging Probe. Model: <br /> ❑ Annular Space or Vault Sensor. Model: ❑ Annular Space or Vault Sensor. Model: <br /> ❑ Piping Sump/Trench Sensor(s). Model: ❑ Piping Sump/Trench Sensor(s). Model: <br /> ❑ Fill Sump Sensor(s). Model: ❑ Fill Sump Sensor(s). Model: <br /> ❑ Mechanical Line Leak Detector. Model: ❑ Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑ Dispenser Containment Float(s)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> ❑ Other(specify equipment type and model in Section E on Page 2). ❑ Other(specify equipment type and model in Section E on Page 2). <br /> C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br /> manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to <br /> verify that this information is correct and a Site Plan showing the layout of monitoring equipment. For any equipment <br /> capable of generating such reports,I have also attached a copy of the(check all that apply): %4,System set-up report; <br /> JLAlarm history report. <br /> Technician Name(print): ;> SI1N�`�( �t i l�t�t�.'� Cert./Lic.No.:C bcj ICI'J OS A Signature: . <br /> Testing Company Name: /moi •u7�� Phone No.: ��1 YO"Xi^h, <br /> CALM-01 Pate I of 3 11/15/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.