My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 4:00:13 PM
Creation date
6/3/2020 9:50:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 Ail Facility # 11195, Lathrop <br />• V_X9W*_T'MU=* <br />10. All records of investigations, repairs, or replacement shall be kept at thd <br />Tosco Refining and Marketing Office for a minimum of 3 years. <br />9 <br />The facility maintains an Emergency Response Training Program which is attached to <br />the Hazardous Material Business Plan. The Station Manager periodically inspects thA <br />site to ensure a safe work environment. Additionally, employees receive verbal <br />training in the following areas: <br />1 . Emergency shut-off switch location and activatio <br />2. Emergency response notification procedure; <br />3. Shut -down operations; and <br />4. Spill clean-up. I <br />Tank and meter inventory reconciliation forms shall be completed by the <br />dealer/manager, or his/her designee, on a daily basis. The facility completes the <br />following forms: <br />1. Inventory Control Program Daily Tank Reconciliation Form <br />2. Meter Worksheet <br />3. Inventory Control Program Receipts, Sales and Overages Worksheet <br />4. Tank and Meter Reconciliation <br />5. Tank and Meter Reconciliation Summary <br />2869R126.wPb 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.