My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 4:00:13 PM
Creation date
6/3/2020 9:50:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ppoe Underground Storage Tank Monitoring Program t <br /> 1. Operator/Site Number: NASSER ARBABIAN Cost Center#2611195 RE#30225 41 <br /> 2. Site Address and Phone Number: 16500 LOUISE LATHROP, CA 95330 ph. (209) 983-0381 <br /> TOSCO <br /> 4. Frequency of Monitoring Method and location Where Monitoring will be Performed: <br /> Tanks: Tank(s)01 02 are monitored continuously using an electronic probe in the interstitial space of the tank. <br /> Piping: Pipe(s)0102 have tightness tests performed annually capable of detecting a 0.1 gallon per hour release. Pipe(s)01 02 are monitored continuously by a liquid-detecting probe <br /> located in the turbine sump. <br /> Dispenser: Dispenser pans are equipped with continuous mechanical monitoring/mechanical shut-off device. — <br /> 5. Name(s)and title(;)of the person(;) responsible for performing the monitoring and/or maintaining the equipment: <br /> Operator Name and Number: NASSER ARBABIAN - (209)983-0381 <br /> Maintenance: TOSCO Service Contact Center - 1-866-805-4357 <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> 6. Reporting—Format: <br /> The monitor will be certified annually and a report generated and provided to the operator. The operator is to report all audible or visual alarm conditions that may indicate a potential release to <br /> the TOSCO Field Representative,as well as the responsible party for maintenance listed under#5. In the event of a test failure,the specific piece(s)of equipment are taken out of service and <br /> proper reporting procedures followed. The operator is to report all suspected and confirmed releases to the TOSCO Field Representative,as well as the responsible party for maintenance listed <br /> under#5. <br /> 7. State the Preventative Maintenance Schedule for the Monitoring Equipment: <br /> The electronic monitoring system is certified annually to be functioning per manufacturer instructions by a properly trained and certified third-party contractor. Repairs are made by the <br /> responsible party listed under#5 upon notification by the station operator. The station operator is responsible for maintaining copies of testing results and repair records on site and available for <br /> agency inspectors. The 3rd-party testing requirements and frequencies for the tank system are summarized below. <br /> Contractor Tank Tightness Testing Requirements/Frequency Line and Other UST System Testing Requirements/Frequency <br /> Contractor testing of the primary tank is not required. Mechanical leak detector(s)tested annually. <br /> Piping 01 02 are tested annually. <br /> The tank secondary containment is tested per manufacturer's specifcations every 3 years in <br /> accordance with CCR Title 23 Section 2637. Secondary containment testing for piping,turbine sumps and dispenser pans is <br /> conducted ever�3 ears ueer manufacturer's seecification under CCR Title 23. <br /> 8. Describe the Training Needed for the Operation of Both the Tank System and the Monitoring Equipment: <br /> The operator has been trained to check the tank system and/or monitor daily for proper operation.Training topics include performing daily/monthly inventory reconciliation,inspection of the <br /> monitoring system to ensure it is operating properly and not in alarm,periodic inspection of under-dispenser for leaks,inspection of fill and vapor spill buckets,inspection of hoses,nozzles,and <br /> other ancillary tank system equipment. If the tank system and/or monitor is not functioning correctly,the operator has been instructed to repair the equipment(if appropriate)or contact the <br /> responsible party for Maintenance listed under item#5 for repairs. <br /> 9. Su —S —0 at or— — — —Requir—ement— — s—: — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — <br /> mmaryof <br /> For double wall tanks monitored by interstitial probes,the monitoring equipment must be continously operational with probes in place. Report all non-inventory monitoring alarms to the <br /> specified maintenance company and keep a record of alarms and repair work performed. All sites are responsible for maintaining daily and monthly inventory reconciliation records and <br /> notifying the TOSCO Field Representative and the Regional Environmental Compliance Specialist for inventory variances greater than the regulatory limit. <br /> 2611195/30225 NASSER ARBABIAN, 16500 LOUISE, LATHROP,CA 95330 Date Printed: 10/23/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.