My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR-3-2009 04:44A FROM:WILKEYS CONSTRUCTION 9166551026 TO:12094683433 P.5/8 <br /> ;4 <br /> .1 W.. , s'di r .. <br /> . t •'�'>.' a .. 'u +f ug. as �'`X"'. <br /> EFFECTIVE VAPOR RECOVERY MONITORING; <br /> -ROM <br /> THE KEY Too REIMAING Mao CuRMIANCE. <br /> Y i � <br /> PRODUCT COMPONENTS: <br /> Veeder-Rootk California Air Resources Board x- • , <br /> (CARB)certified ln-Station Diagnostics(ISD) - <br /> equipment is designed to monitor the Vapor Flow Meter—Measures the i 9 <br /> collection and containment of vapors by volume of vapors collected during <br /> vapor recovery equipment. Veeder-Rooth vehicle refueling TLS-350 <br /> LSD is a proven vapor recovery monitoring Vapor Pressure Seng—Measures x <br /> system, with over 1,500 sites installed p IF i <br /> throughout California. containment tank pressures for leakage +a <br /> and overpressure conditions for vapor ' <br /> containment monitoring f <br /> Adding to the existing Needer-Root 115-350 I" A Vapor <br /> platform, probes, and Dispenser Interface ISD Software Enhancement Module""' Flow r <br /> Module (DIM) cards, the ISD equipment —Activates ISD software technology <br /> a' <br /> continuously monitors the vapor recovery <br /> equipment,maintains test records,provides NVMEM 2 Board—Provides memory <br /> oo— <br /> test reports, and generates warnings or expansion necessary for ISD report <br /> alarms following equipment failures. storage <br /> A Preferred BalanceISD SokdJon. .� <br /> Veeder Root is the first to introduce a balance <br /> Moor <br /> ISD solution. Compared to assist vapor <br /> monitoring, balance vapor monitoring has <br /> simpler nozzle alarm requirements. Vapor Pressure Sensor <br /> In September 2009,ISD will be required BENEFITS OF THE VEEDER-ROOT ISD SYSTEM: <br /> for all sites in California with an annual <br /> throughput of over 1.8 million gallons. In MEETS COMPLIANCE REQUIREMENTS- COST EFFECTIVE SOLUTION: <br /> September 2010,ISD will be required for <br /> those sites with an annual throughput of -e- CARB certified to meet Enhanced vapor =c- Leverages existing TLS-350 equipment— <br /> over 600,000 gallons. The Veeder-Rant Recovery(EVR)and In-Station can be added to any TIS-350 console <br /> ISD system will keep station owners in Diagnostics(ISD)requirements <br /> compliance with these new regulations. Interfaces to the existing Smart <br /> =9� Archives the reports required to meet Sensor Interface Module <br /> California regulations (7 or 8 input version) <br /> 4- Alarms when there is a vapor collection Sensors can share wiring conduit with <br /> problem on a hose or when vapor space other intrinsically safe(IS)wiring <br /> is leaking <br /> Simple installation,compatible with <br /> Continuously monitors vapor recovery all dispensers <br /> systems and alarms when systems' <br /> performance drops below required <br /> compliance level <br /> =� Reduces emissions related to failed or <br /> degrading equipment 0 <br /> e green" <br />
The URL can be used to link to this page
Your browser does not support the video tag.