My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 8 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑Sump Manufacturer El Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum El Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:INCON Equipment Resolution:: +/-0.002" <br /> UDC# 1/2 UDC# 3/4 UDC # 5/6 UDC # 7/8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Steel Steel Steel Steel <br /> UDC Depth: 10" 10" 10" 10" <br /> Height from UDC Bottom to Top of Floor penetration Floor penetration Floor penetration Floor penetration <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest Floor penetration Floor penetration Floor penetration Floor penetration <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: D D Dry D <br /> Portion of UDC Tested' 2" above product 2" above product 2" above 2" above" <br /> product <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product ❑ Yes ❑ No O NA ❑Yes ❑ No 91 NA ❑ Yes ❑ No O NA ❑ Yes ❑ No 0 NA <br /> and water . <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe i ❑ Yes ❑ No ® NA ❑Yes ❑ No El NA ❑ Yes ❑ No El NA ❑Yes ❑ No Fx1 NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No 0 NA ❑ Yes ❑ No ® NA ❑Yes ❑ No ® NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 min 10 min 10 min 10 m i n <br /> test <br /> Test Start Time: 12:46 pm 01:19 pm 01:19 pm 01:54 pm <br /> Initial Reading Ri): 0.009" 0.420" 0.089" 0.102" <br /> Test End Time: 01:01 pm 01:34 pm 01:34 pm 02:09 pm <br /> Final Reading(RF): 0.008" 0.419" 0.087" 0.101" <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading RF-Ri : -0.001" -0.001" -0.002" 0.001" <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: ® Pass U Fait: IM Pass D Fail Q Pass D Fait 0 Pass,❑ Fail <br /> Was sensor removed for testing? ❑ Yes ❑ No rx-1 NA ❑ Yes ❑ No E NA ❑ Yes ❑ No 0 NA ❑ Yes ❑ No O NA <br /> Was sensor properly replaced after ❑ Yes ❑ No [H] NA ❑ Yes ❑ No ❑x NA ❑ Yes ❑ No 0 NA ❑ Yes ❑ No 0 NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.