My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANFLPION PPECIS]ION -XESTING, INC <br />PO Box 13059 Sacramento, Ca 95813-3059 <br />(916) 927-1557 800-660-9443 FAX: (916) 927-7345 <br />Contw*wOMI'MI� <br />Pressure Decay Test <br />TP 201.3 <br />Confirmation# <br />Testina Comww. <br />Chanvion Tank Testing. Inc <br />Permit No. <br />Address: <br />1875 Diesel Dr. Suits 12 <br />Site Name: Ni < ALf <br />Sacramento, Ca 95838 <br />Address: /A' 5L6 C &QU IS <br />e !0- Phone. <br />(916) 927-1557 <br />L 9 n <br />Phone: _16!j( I - jS;7-Q3rWl_ <br />Phase I System: 05J*tf7-- <br />Tanks Manilolded? <br />Phase 11 System: fD"*.C- P0,A7--• <br />Vapor Pot Present: <br />Total #of Nozzles 9 <br />NOZZLES for TANK #1 <br />NOZZLES for TANK #3 <br />N I OZZLES for TANK #2 <br />NOZZLES for TANK #4 <br />Balance "Nozzle End" hoses must be drained prior to test Number of hoses over 100 <br />I ianK ittrorfnation <br />a <br />Nitrogen induction point Phase I vapor coLoer or Phase 11 vapor Riser f I Phase I D4 Phase 11 <br />Record Vapor Coupler Integrity Test Assembly pressure after 1 minute: 2,6 <br />Type of pressure device used. D41ncline Manometer I ] Mechanical Digital - must do drift test <br />Enter calibration Date for pressure Devise (90 days) <br />Enter initial tank ullage pressure (Vent if over 0.5 in. we) <br />Enter flowmeter rate, F(must be 1 to 5 CFM) <br />Enter calculated ullage Fill Time (Q) <br />3 9' Enter actual fill4me <br />IV A, Enter ending value of drift test (Must be 0.01 in. we or less) <br />TEST CONDUCTED BY: <br />A4*409rn g2E� 2LCg-,IA;r <br />SIGNATURE <br />t2=- V <br />[15221F <br />Tester I D: M C % 3, — <br />C <br />Test Date: 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.