Laserfiche WebLink
�=MtAn RUILIDI tlain IKIONI 119101019#&-TA�I <br />Facility is Not Equipped With Spil]/OyeContainment Boxes LI <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: <br />0 Spill Bucket Manufacturer 1-<ndustry Standard 11 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />0 Pressure <br />0 Other (Specify) <br />11 Vacuum <br />'�.',dydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />gp spin Box Spill Box # VP 14 2 <br />Lm��✓fflm <br />Bo,I-t <br />Spill x # <br />Spill Box #(1,4,w <br />Bucket Diameter <br />'(4 <br />Z i,( <br />/ lz�� e <br />Bucket Depth: <br />Wait time between applying <br />pressurelvacuum/water and <br />start* test: <br />A-tP <br />Test Start Time: <br />Initial Reading (P4): <br />Tea End Time: <br />I Yz <br />yo <br />Final. Reading (RF): <br />ile lee <br />9 <br />. , e <br />Test Duration: <br />IA? ,-- <br />Change in Reading (RF -124): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />#"Pass 0 <br />4K—Pa" 0 F• <br />0 Fad <br />44as—S <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />