Laserfiche WebLink
ti r <br />1 <br />Triangle Environmental, Inc. <br />SYSTEMS TANK, LINE AND LEAK DETECTOR TEST REPORT <br />Facility: Facility # 2611195 <br />Tank #: 1 <br />Test Date: 9/19/03 <br />Product: Unleaded Regular <br />Work#: 20001875 <br />ling! <br />11111lig <br />Test Method: System 4000 <br />I <br />Test Method: <br />IN <br />R.J. FTA <br />Capacity: 11849 <br />Manufacturer: <br />FE Petro <br />Diameter (in): <br />L/D Model: <br />STP MLD <br />Product Level (in): <br />L/D Serial #: <br />Liquid Volume (Gals): <br />Line Drain Back (ml): <br />128 <br />Liquid Percent (%): <br />L/D Trip Time (sec): <br />3 <br />Specific Gravity: <br />Holding Pressure (psi): <br />30 <br />Coef. of Expansion: <br />Metering Pressure (psi): <br />14 <br />Water On Tank (in): <br />L/D Test Rate (gph): <br />3.0 <br />Water In Tank (in): <br />L/D Result: <br />PASS <br />Product Temp. (F): <br />New leak detector? <br />No <br />Head Pressure (psi): <br />Test Start Time: <br />Test End Time: <br />Test Method: <br />TEI LT -3 <br />Test Rate (gph): <br />Pump Brand: <br />FE Petro <br />Test Result: NIA <br />System Type: <br />Pressure <br />Line Pressure (psi): <br />52 <br />EmLine <br />Start Time: <br />11;00:00 AM <br />Test Method: ULLAGE <br />Line End Time: <br />11:15:00 AM <br />UllageVolume (gals.): <br />Line Start Level: <br />220 <br />Ullage Test Time: <br />Line End Level: <br />215 <br />Ullage Vacuum (psi): <br />Line Test Rate (gph): <br />-0.006 <br />Ullage Result: N/A <br />Line Test Result: <br />PASS <br />2 <br />