My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
16500
>
2300 - Underground Storage Tank Program
>
PR0231554
>
COMPLIANCE INFO_2003-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 2:05:37 PM
Creation date
6/3/2020 9:50:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2010
RECORD_ID
PR0231554
PE
2361
FACILITY_ID
FA0005678
FACILITY_NAME
LATHROP SHELL
STREET_NUMBER
16500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
16500 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231554_16500 S HARLAN_2003-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B <br />MONITORING SYSTEM CERTIFICATION <br />For Use By All Jurisdictions Within the State of California <br />Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16, Division 3, Title 23, California Code of Regulations <br />This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to <br />the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. GeneralInformati <br />Facility Name: tom/ Bldg. No.: <br />Site Address: ��,Sy� � ✓i SLr A City: ��� � Zip: <br />Facility Contact Person: /y/cContact Phone No.: <br />Make/Model of Monitoring System: % S' 3 3� Date of Testing/Servicing: <br />B. Inventory of Equipment Tested/Certified P10 57Z- 1-192 2' - d 01 <br />Check the appropriate boxes to indicate specific equipment inspected/serviced: <br />T,a�k ID' ~ <br />Tank ID: 9 >' <br />71, -Tank Gauging Probe. Model: / /� / <br />❑ In -Tank Gauging Probe. Model: <br />0�Annular Space or Vault Sensor. Model: <br />❑ Annular Space or Vault Sensor. Model: <br />® Piping Sump / Trench Sensor(s). Model: 1 y <br />❑ Piping Sump / Trench Sensor(s). Model: u <br />❑ 'll Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />Mechanical Line Leak Detector. Model: 5RP- <br />❑ Mechanical Line Leak Detector. Model: 5 ' /Y < /� <br />❑ Electronic Line Leak Detector. Model: <br />❑ Pectronic Line Leak Detector. Model: <br />Tank Overfill/ High:: r. Model:OP ov - eff i/,,"— <br />®'Tank Overfill / High-Ley4j_ ter. Model:0 <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />Tank ID• <br />Tank ID: <br />❑ In -Tank Gauging Probe. Model: <br />❑ In -Tank Gauging Probe. Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Annular Space or Vault Sensor. Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Piping Sump / Trench Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Electronic Line Leak Detector. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specify equipment type and model in Section E on Page 2). <br />❑ Other (specify equipment typp and model in Section E on Page 2). <br />Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containme t Sensor(s). Model: <br />❑ Dispenser Containment ensor(s). Model: <br />ar Valve(s). <br />4>S ear Valve(s). <br />❑'Dispenser Containment Float(s) and hain(s). <br />❑ Dispenser Containment Float(s) and Chaih(s). <br />Dispenser ID: <br />Dispenser ID: <br />O'giSpenser Containment Senso (s). Model:❑Dispenser <br />Containment nsor(s). Model: <br />k7 Shear Valve(s). <br />h/ear Valve(s). <br />►spenser Containment Float(s) and Chain(s) <br />� <br />U -E ispenser Containment Float(s) and Chain(s). <br />..Dispenser ID: <br />Dispenser ID: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Dispenser Containment Sensor(s). Model: <br />❑ Shear Valve(s). <br />❑ Shear Valve(s). <br />❑Dispenser Containment Float(s) and Chain(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in <br />this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e g. manufacturers' checklists) n cessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring t. Fo any equtpm capable of generating such <br />reports, I have also attached a copy of the report; (check all that ap <br />�pme <br />asy set-up Alarm history report <br />Technician Name (print): _Tom Corcoran Signature: <br />Certification No.: UO <br />License. No.: U _-2- 1K2_ G <br />Testing Company Name: Triangle Environmental, Inc. Phone No.:(818)840 7020 <br />Date of Testing/Servicing:�6 <br />Site Address: <br />,p <br />t <br />M <br />Page 1 of 3 <br />03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.