Laserfiche WebLink
NICK ARBABIAN 2QQ4729584 p.2 <br /> fo _9 <br /> UNIFIED PROGRAM CONSOLIDATED!FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC}MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE F9�16LOWING METHOD a�s4b <br /> 490-516 <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING Er2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS 099.OTHER(Specify): — <br /> -PA_NEL MANUFACTURER: <br /> 49U-M.'L(- O <br /> LEAK SENSOR MANUFACTURER: <br /> MODEL#(S): 49rssa <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES 0;6 NO 496.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN YES ❑b.NO 491-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E0--.3<' <br /> �YES ❑b.NO 'ter <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. is a.YES ❑b.NO 490-62 <br /> 2.UISC CONSTRUCTION IS []I-SINGLE-WALLED 2.DOUBLE-WALLED " <br /> IFDOUBLE WALLED: 41904" <br /> UDC INTERSTITIAL SPACE IS MONITORED BY:__ i.LI UID_-2.PRESSURE _2 VACUUM <br /> �A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO 490k-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-e5. <br /> -_—_LM&DETE�QN(ELD�MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUtRED_�CCR§267d� <br /> ❑2.SECONDARY CON_TAINMENT_COMPON_ENT_S ARE TESTED EVERY 36 MONTHS. —-- —— — _ —�_-- 49D" <br /> ❑3.SPILL BUCKETS ARE TESTED ANNUALLY. — —�— 4�67 <br /> VIII.RECORDKEEPING <br /> The Wowing monitonng/main ante records are kept for this facility: ,-, <br /> [Maim logs 490-6ft isual Inspection Records 490-Rxb g-�ank integrity testing results 49o-6rc <br /> ❑SIR testing results(and supporting documentation recordS). 490-69d ❑ Tank gauging results(and supporting documentation records). 4w-6" <br /> ❑ATG Testing results(and supporting documentation records).490-6sf ❑ Corrosion Protection 60-day logs 490-css <br /> quipment maintenance and calibration records. 4%4,sh <br /> IX.TRAINING <br /> ersonnel with UST monitoring responsibilities are familiar with all ofthe following doctanents relevant to their job duties. 490ar,% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY((Check all that apply) <br /> IS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49o4% <br /> Q,PERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49o-wc <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49-34M <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69a <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION-490.69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS 49"98 <br /> OTHER(Specify):%its*,Mri9i <br /> his facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the folloWing: <br /> A Operation of the UST systems in a enranner consistent with the facility's best management practices <br /> • The facility employee's Tole with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> A The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> A Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTSfADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how marry pages with additional information on specific monitoring procedures are attached to this plan.49D-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST OwnedOperator is responsible for ensuring that:I)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained property. <br /> The followi persons,are sible for perf Ing the monitoring and equipment maintenance: <br /> NAME 1 v1 490.72 TITLE ekJA 490-73 <br /> '_NAME 49o-74 TITLE 490-75 <br /> The Designator!Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 490.76 DATE: <br /> 42-/9 jr`p 4wFT7 <br /> r. <br /> APPLICANT NAME(print): 49(F78 APPLICANT TITLE: a9oa9 <br /> UPCF UST-D(1.2/2007)34 <br />