Laserfiche WebLink
SWRCB, January,2002 Page 2 of 4 <br /> 9. S /OVERFILL CONTAINIVMNT BO)* <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Yt SSP <br /> i, Spill Box# Spill Box# Spill'Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: too <br /> Initial Reading(Rl): b ` <br /> Test End Time: 0to <br /> Final Reading(RF): <br /> Test Duration: d <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass [01 Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Commenis—(include in ormation on re aifs made prior to testing, and recommended follow-up for failed tests) <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Attn:Scott Bacon <br /> 1001 "P' Street,Box 944212 <br /> Sacramento,CA 95814 <br /> Phone: (916)341-5873,Fax:(916)341-5808 <br /> e-mail:bacons@cwp.swrcb.ca.gov <br />