My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 12:53:34 PM
Creation date
6/3/2020 9:50:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 QV ff*1%11r% A" t "�— 0 <br />Page 4 of <br />Test Method Developed By: <br />Test Method Uses: <br />9 IIll % A A AA. Ai 1 JV O A lU'j" <br />Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Spec) .: <br />drPressure 0 Vacuum O Hydrostatic <br />0 Other (Specify) <br />Measuring Equipment Used for Testing: reSSLAV f CeA <br />Piping Run NZ <br />Piping Material: xll lus <br />Imaim <br />Piping Run # Z_ Piping Run f , <br />Piping Manufacturer: <br />.5 e <br />Piping Diameter: <br />3 t, <br />,3• l <br />Length of Piping <br />A AYV-1-- 'A Sp / <br />wx , ZG,9 l <br />Product Stored: a,e d _ S P t_ <br />Method and location of <br />piping -run isolation: --54— <br />Wait time between applying <br />ressur acuum/water and <br />s test: l <br />.41 'D FP V L <br />Test -Start Time: <br />! .' I S <br />l • l S - '� <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />5 5 <br />17 <br />Test Duration: <br />vL <br />Change in Reading (RF -R,): <br />do <br />Pass/Fail Threshold: <br />/■q6p TK ppe' <br />Ma Le 55 <br />Comments — (include information on repairs made prior to testing <br />SWRCB December 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.