Laserfiche WebLink
m Page ) of I <br />5 4r CnNTADV Drwv -rsenry7vi- <br />Test Method Developed By: <br />fXiping Manufacturer <br />0 Other (Spec) <br />0 Industry Standard 0 Professional Engineer <br />Test Method Uses: <br />'Pressure <br />0 Other (Spec) <br />0 Vacuum 0 Hydrostatic <br />Measuring Equipment Used for Testing: <br />Piping Run # <br />Piping Material: k 5 S <br />Piping Run # Z Piping Run # <br />r '?.Gy tk S S <br />Piping Manufacturer: <br />Piping Diameter: <br />•` �� <br />3 t< <br />Length of Piping Run: <br />yoiR . ;zoo <br />A-0 ayvy • zzo r <br />Product Stored: <br />Method and location of <br />i in -run isolation: <br />5- z LbMMA 45 <br />!yP—c <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />&AIT5 <br />S <br />Test Start Time: <br />Initial Reading (111): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold: <br />Test Result <br />Comments — <br />SWRCB December 2001 <br />