Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit holder must notify Environmental Health Department, (209) 468-3420 <br />within 30 days of any changes to the monitoring procedures, unless required to obtain approval or a permit before making <br />the change. Required by CCR 2632 (d) and 2641 (h). <br />FACILITY NAME <br />FACILITY ADDRESS <br />DATE <br />l .Name(s) and Title(s) of the people responsible for performing the monitoring and/or maintenance <br />2.Describe the frequency of performing the monitoring for: <br />TANKS <br />3.Describe the location(s) of where the monitoring will be performed. ie: location of sensors <br />4.Describe the following equipment for each underground storage tank. <br />Name and Model of Monitoring Panel <br />Name and Model of Line Leak Detectors <br />Name and Model of Annular Sensors <br />Name and Model of Piping Sensors <br />Name and Model of Dispenser Sensors <br />Type of overfill prevention <br />5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes ❑ No ❑ <br />Does the turbine shut down if a sensor is disconnected? Yes ❑ No ❑ <br />Does the turbine shut down is the monitoring panel loses power? Yes ❑ No ❑ <br />6. How will the alarm history and subsequent maintenance be recorded? <br />7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br />Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br />annual monitoring certification be performed in? <br />Note: For new installations the secondary containment must be tested 6 months after installation. All secondary containment systems <br />must be tested once every 36 months with initial testing performed before January 1, 2003. <br />8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br />equipment. <br />I:\Unit a \USrmonitoringplan.doc <br />5/30/2002 <br />