Laserfiche WebLink
BOAR) OF TRUSTEES <br />James Culbertson, Pres. <br />Patricia E. Vannuccl, Secy. <br />Anthonelle Von Spronsen <br />Eari Ptmentel <br />Fern Bu®bee <br />Daniel L. Flores <br />John D, Most, M.D. <br />William J. Wade <br />Mary Anna Love <br />SAN J AQUIN LOCAL HEALTH DISTRICT <br />e <br />1601 East Hazelton Avenue. P. O. Box 2009 <br />Stockton. California 95201 <br />2W/466-6781 <br />Jo®I Khanna, M.O.. M.P.H.. District Health Officer <br />SHEET #2 <br />Facility Name San Joaquin General Hospital <br />Address 500 W. Hospital Rd., -French --Camp, CA <br />Date of Inspection 8-27-86 <br />MONITORING ALTERNATIVE #7 <br />Inspector Laurie A. Cotulla <br />(TANK #3) <br />1 771 <br />SERVING. <br />City of LOdl- <br />San Joaquin County <br />Clly.ol Escalon <br />City of Manteca <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />San Joaquin County <br />San Joaquin County <br />Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br />where the liglii(. level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />__Tank gauging performed as follows: <br />L'�Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />L' lank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />—4ZLiquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />_ If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />Precision test(s) must be performed by _:8`-' 3 —5'And results submitted to this <br />office within 30 days of the test. <br />02 - <br />Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />