My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 12:53:34 PM
Creation date
6/3/2020 9:50:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FACILITY NAME: <br />NEW UST' <br />TAXXf <br />rALLATION INSPECTION <br />0 6 <br />t" 31.$6cj TANK MODEI./MATERM: Z>/< <br />R.E.H.S:.Ao,Gr,� r,""_vE <br />INITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VAC": SOAP: PSI: HRS/HIN: BRINECLIQUID ANNULAR): OTHER: <br />P <br />H <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />SECONDARY PIPING CONTAINMENT TEST PSI: NRS/ a OTHER: <br />P <br />I <br />WITH MANUFACTURER {MITTEN SPECIFICATIONS <br />8. <br />R <br />T <br />(CCR 2635 CA)) <br />0 <br />I <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />(C 2635) <br />V <br />A <br />10. <br />OVERSPILL PERFORMANCE TEST <br />E <br />L <br />r/ <br />11. <br />D <br />S <br />22. MONITORING METHOD FOR ALL TANKS ANO PIPING APPROVED (CCR 2641-2644) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />��lr1 <br />i/ <br />1. UST PLANS SUBMITTED/ FEES PAID CH+S CODE 25287, COR 2635 CD) (a) <br />2. UST'INSTALLATION PLANS APPROVED CCCR 2635 CE) (5)) <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />® <br />6. <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VAC": SOAP: PSI: HRS/HIN: BRINECLIQUID ANNULAR): OTHER: <br />` 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTE3N (PANEL) CCCR 2632 (A) (2)) <br />4. PRIMARY TANK TEST: PSI: S 3/f HRS <br />SECONDARY PIPING CONTAINMENT TEST PSI: NRS/ a OTHER: <br />(CCR 2635 (A) (4)) <br />5. TANK APPR OPR IATELT PLACED WITH APPROVED SAWILL, (CCR 2635 (A) C3) C4) (6)/ API/P£I) <br />PIPING INSPECTIONS <br />® <br />6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) -pr <br />2635 (B) (4)) <br />` 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTE3N (PANEL) CCCR 2632 (A) (2)) <br />SECONDARY PIPING CONTAINMENT TEST PSI: NRS/ a OTHER: <br />(CCR 2635 (A) (4)) <br />C 15. PERFORMANCE TEST OF JUTCRATIC PUMP SYSTEM SHUT-OFF CC3R 2635 CB} (5)) <br />8. <br />LAKE TEST ON ALL SLIPS (24 HR. MINIMUM) HRS: <br />t 16. BALL FLOAT VALVES tNSTALLED CCCR 2635 (B) (6)) <br />(CCR 2635 CA)) <br />17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br />UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED <br />(C 2635) <br />/p (/ <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR 2635 (A) (4)) <br />U 20. MONITORING PWA, REWOM PLAN AND LOG BOOK ON SITE (CCR 2632 CE) Cl) (2)) <br />r/ <br />11. <br />ALL PIPING AND FITTDIGS CORROSION PROTECTED <br />(CCR 2635 (B)) <br />FINAL INSPECTION <br />EH23-006 3/92 (REVISED 11\92) <br />93 <br />1Z. PERFORMANCE TESL' FOR •ALL■ MONITORING PROBES (CCR 2632 (C) (2)) <br />® r <br />` 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTE3N (PANEL) CCCR 2632 (A) (2)) <br />14. PERFORMANCE TEST OF LINE LEAK DETECTION CCCR 2632 (D) 2635 (B) (5)) <br />/O !YitA, <br />C 15. PERFORMANCE TEST OF JUTCRATIC PUMP SYSTEM SHUT-OFF CC3R 2635 CB} (5)) <br />t 16. BALL FLOAT VALVES tNSTALLED CCCR 2635 (B) (6)) <br />17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WATERTIGHT) (CCR 2631 CD) (5)) <br />19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />U 20. MONITORING PWA, REWOM PLAN AND LOG BOOK ON SITE (CCR 2632 CE) Cl) (2)) <br />21. 'C` FORM COMPLETED AND SUBMITTED (CUR 2635 CE)) <br />i <br />!! <br />22. MONITORING METHOD FOR ALL TANKS ANO PIPING APPROVED (CCR 2641-2644) <br />23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED CH+S CODE 25284 (E) CF)) <br />EH23-006 3/92 (REVISED 11\92) <br />93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.