My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 12:53:34 PM
Creation date
6/3/2020 9:50:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />R- I? - R i chard s I an c® RECEiVE01 <br />5949 Hol 1 is -ter Ave ,SUN - L'Lq,i <br />Goleta, Ca® 93117 10 <br />805 ) 683-1511 PERINIJOB#204 <br />14 •; • t = <br />Project:... . ► 900 <br />Perini Builders <br />120 W. Mathews Rd. <br />French Camp, Ca. 95231 <br />Attn: Scott Drane <br />RE: SUBMITTAL SECTION 15605 <br />FUEL -OIL HANDLING <br />EQUIPMENT <br />SURMiiTAL NO. ! --, 57-_ Z uAi� iri�� <br />This submittal has been reviewed by Perini <br />Building Company only for completeness and- <br />general <br />ndgeneral compliance with the contract documents. <br />Perini Building Company assumes no liability <br />for quantities, colors. dimensions, sizes. <br />weights. calculations. etc. as shown herein. <br />REVIEWEDREVIEWED AS NarM ❑ <br />REJECTED 9 REVISE AND RE=.-- <br />UBM <br />PEFUNI BUILDING COMPANY. INC. <br />X Attached _ Separate Cover Via: <br />June 1, 1994 <br />_ Shop Dwg _ Prints _ Plans _ Samples Specifications <br />_ TQtter _ Change Order X Other: SUBMITTAL <br />NA. iNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN <br />Copies Date Item Number Description <br />NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN <br />10 OIJUN94 SUB 15606-001 2.01A FIBERGLASS STORAGE TANK <br />10 01JUN94 SUB 15605-002 2.01B MONITORING & ALARM ASSEMBLY <br />10 01JUN94 SUB 15605-003 2.01C DAY TANK ASSEMBLY <br />10 01JUN94 SUB 15605-004 2.01D LIQUID SENSOR & CONTROL PANEL <br />10 01JUN94 SUB 15605-005 2.01E PIPING <br />These above items are transmitted for your action as noted: <br />X For Approval _ For Review And Comment _ Returned For Corrections <br />X For Your Use _ Approved As Submitted _ Resubmit Copies For Approval <br />_ As Requested _ Approved As Noted _ Submit Copy For Distribution <br />_ Bids Due: Returned After Loan v Return Copies Corrected Print <br />
The URL can be used to link to this page
Your browser does not support the video tag.