My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 12:53:34 PM
Creation date
6/3/2020 9:50:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06.,01/94 13:33 _$_`5056336531 R P RICHARDS <br />LEO a0hgGER1111W 4& <br />Zoc1g•wa <br />t'. uc; <br />WERE ROPE / r, FRP STRAP <br />TRIPLE t` <br />CLAMP <br />sliso Erol« <br />/ w. tetad A <br />\l, Oauble Wall f o�;ona� <br />Tank Twxw <br />f <br />M <br />I Ass4moN <br />, <br />No. of Strap* <br />12' Min. <br />Buoyancy Load <br />BACKFILL BED <br />ZFjbarj71,&z=:Anch-*rin9 <br />Tank Capacity <br />QI®moter <br />Required <br />Strap Length <br />(Per Strap)(Pounds) <br />9/16' <br />n mec <br />600 <br />4' <br />2 <br />7'3 1h' <br />4,200 <br />2'7x8' <br />speafied. Fiberglas anchcring straps <br />1,000 <br />4' <br />2 <br />7'3.10' <br />4.200 <br />2-1/2' <br />4-1/4' <br />2,500 <br />6' <br />2 <br />9110, <br />18.000 <br />4-1/4' <br />are available for ail double -Walt tanks. <br />4,000 <br />6' <br />2 <br />9.101 <br />18.000 <br />IThese straps are pre -shaped to the <br />6.0c0 <br />6' <br />4 <br />9' 10' <br />18.000 <br />contour of the tank wall. The strap <br />6,000 <br />8' <br />2 <br />14'10' <br />25.000 <br />length is shown on the taole to the <br />8,400 <br />8' <br />4 <br />14'10' <br />25.000 <br />10,000 <br />8' <br />4 <br />14'10' <br />25,000 <br />right: <br />12.000 <br />8' <br />4 <br />14'10' <br />25,000 <br />15.000 <br />10' <br />4 <br />18'0' <br />32,000 <br />20,000 <br />10' <br />6 <br />1810' <br />32.000 <br />25,000 <br />10' <br />8 <br />18'0' <br />32.000 <br />30,000 <br />10' <br />8 <br />1810' <br />32.000 <br />WERE ROPE / r, FRP STRAP <br />TRIPLE t` <br />CLAMP <br />sliso Erol« <br />/ w. tetad A <br />\l, Oauble Wall f o�;ona� <br />Tank Twxw <br />f <br />M <br />I Ass4moN <br />, <br />12' Min. <br />(Nominal) <br />BACKFILL BED <br />OEAO MAN <br />t <br />ANCHCFt PAO SYSTEM <br />ANCHOR SYSTEM <br />G <br />4 ft. <br />TANK ENO VIEW <br />tF <br />IF�tas STRAP Double Reducer Bushing <br />STRAP Owens•Coming provides a reducer bush - <br />STEEL G ing which allows one standard 4' NPT fit- <br />GALVANIZE <br />ting to accommodate both the fuel supply <br />�' 4 <br />41 and fuel return lines for a fuel oil system. <br />STRAP EYELET <br />CIETAIL A <br />Tank <br />Diameter <br />(Nominal) <br />H <br />D <br />E <br />F <br />G <br />4 ft. <br />110' <br />9/16' <br />1.31E' <br />1.118' <br />2-1/11.' <br />6 ft. <br />3' t -1/Z' <br />1.1/5' <br />2'7x8' <br />2.1r?' <br />41/4' <br />8 ft <br />2' 8-3/4' <br />1.1/8' <br />2-7/8' <br />2-1/2' <br />4-1/4' <br />1011 <br />4' 2' <br />1-1/8' <br />2.7/8' <br />2-1/2' <br />4-1/4' <br />Helicalating 001113 <br />For viscous ducts (such s 6 heating <br />oil) heating coils a availa e. Attached <br />to a heavy-duty Spa i ted carbon <br />steel 22' 10-manwayco r. the 1-1/4' <br />schedule 40 carbon ste I h ting coil is <br />installed to leave 8' cl rarce t m the <br />bottom of the tank. uctior, and r urn <br />couplings can be ins alied in the man 3N <br />lid. (Not included w h heating coil.) Col, <br />area for heat purpo es is 20.5 sq. ft. A <br />heating coil can als be centered on 30' <br />and 36' manway c vers. <br />Note that any heating coil must <br />not heat the tank contents over <br />150°. Higher interna) temperatures <br />will cause tank failure, product <br />to.3s and environmental damage. <br />3 <br />s <br />17/4' COIL INLET <br />AND OUTLET — <br />Ccncertric reducer bushings are not sup- <br />plied by Owens-Corning, but are availebla <br />from petroleum equipment c;s:ributcrs. <br />28' DIAMETER X lie IHICK <br />24 K HOLES ON A 2S 5/19' <br />WLT GIRCLE DIAMETER <br />FTIONAL 2' NPT COUPLING <br />fryp. 2) <br />22' I.O. HEAVY DUTY MANWAY <br />ARIES WITH <br />ANK DIAMETER <br />w4. 0' <br />a <br />z <br />I+755., I a' MINIMUM <br />4'R VAt'SW-W+ G <br />V TI.iPEO <br />-2�re•-� MOLE <br />TOP VIEW <br />
The URL can be used to link to this page
Your browser does not support the video tag.