My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 12:53:34 PM
Creation date
6/3/2020 9:50:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THIJ 13.:3 <br />NOTES. <br />1, ALL FUEL PIPING SHOULD BE OF BLACK <br />IRON OR COPPER PIPE. P!PE SIZES SHOULD <br />FC'A.LOW ENGINE MANUFACTURER'S RECCM. <br />MENDATIONS BASED ON KW CF GENERATOR <br />SET. <br />WARNING:A DANGEROUS INSTALLATION WILL <br />RESULT IF PROPERLY SIZED OVERFLOW AND <br />VENT PIPES ARE NOT CONNECTED TO THIS <br />TANK. <br />OVERFLOW: SHOL -D TANK BE OVERFILLED AS <br />A RESULT OF MISAOJUSTMENT OF FUEL LEVEL <br />CONTROLS, FUEL SPILLAGE OROVERPRES- <br />SURIZATICN OF THE TANK MAY RESULT. AN <br />OVERFLOW PIPE BACK TO THE MAIN STORAGE <br />TANK OF AT LEAST DOUBLE THE SIZE OF THE <br />FILL PIPE (FROM THE PUMP) MUST BE IN- <br />STALLED WITH CONSIDERATION GIVEN TO <br />LENGTH OF RUN AND VERTICAL DROP. NSE <br />MIN. I- I.D.) <br />VENT: A PROPERLY SIZED AND INSTALLED <br />VENT PIPE IS MANDATORY. THE VENT PRO - <br />VIM A MEANS FOR TANK TO BREATHE WHEN <br />FUEL IS WITHDRAWN OR ADDED TO TANK. <br />VENTING ALSO PROVIDES PRESSURE RELIEF <br />IN CASE OF OVERFILL OR RAPID EXPANSION <br />OR GASSIFICATION OF CONTENTS IN EVENT <br />OF FIRE. PORTIONS OF THIS TANK MAY <br />BECOME PERMANENTLY DISTORTED AT <br />----% r zr <br />�132 <br />C <br />PRESSURES ABOVE 5 PSI. AND MAY RUPTURE <br />AT PRESSURES ABOVE THE DESIGNED MAX <br />IMUM WITHSTAND PRESSURE OF 25 PSI. TO <br />AVOID OVERPRESSURIZATION A VENT PIPE TO <br />ATMOSPHERE (OUTSIDE OF THE BUILDING) OF <br />THE SAME DIAMETERAS THE THREADED VENT <br />FITTING INSTALLED IN THE TANK MUST BE <br />PROVIDED TO EXTEND A MINIMUM OF 5 FT. <br />ABOVE TANK TOP, HOWEVER, NO PORTION OF <br />THIS VENT SHOULD EXTEND OR TERMINATE <br />MORE THAN 12 FT. ABOVE THIS TANK. THERE <br />MUST BE NO LOW PORTIONS OR SAGS IN THE <br />VENT PIPE WHICH CAN TRAP LIOU10. PROTECT <br />THE OPEN ENO BY SUITABLE MEANS TO PRE- <br />VENT ENTRY BY INSECTS. FOREIGN MATTER <br />AND PRECIPITATION. <br />NOTE: THE EMERGENCY VENT LINE CAPACITY <br />SPECIFIED ON THE PLACARD AT THE TOP OF <br />THE TANK MUST BE CONSIDERED IN CROER <br />TO MAINTAIN THE FIRE SAFETY FACTORS <br />ESTABLISHED BY NFPA 30 AND VIL 142. IF <br />INSTALLATION IS INTENDED TO CONFORM AND <br />BENEFIT FROM THE INHERENT SAFETY AD- <br />VANTAGES OF NFPA 30 AND UL 142 INSTALLA. <br />TICNI STANDARDS, OBSERVANCE OF THE <br />VALUE IS MANDATORY. R MAY BE NECESSARY <br />TO INCREASE THE VENT PIPE DIAMETER IF <br />THE RUN IS LONG. ' <br />MAINTENANCE. INSPECT THIS TANK AT LEAST <br />EVERY SIX MONTHS FOR DAMAGE. LEAKAGE, <br />OR RUST ON BOTH INSIDE AND OUTSIDE OF <br />THE TANK. PROMPTLY REPAIR OR REPLACE <br />ANY SIGNIFICANTLY DAMAGED OR CET ERIO- <br />RATED TANK. <br />P . © 5 <br />NOTE: THIS IS AN INDUSTRIAL PRODUCT. NOT <br />A CONSUMER PRODUCT. IT MUST BE <br />SPECIFIED. INSTALLED. OPERATED AND <br />MAINTAINED BY INDIVIDUALS EQUIPPED WITH <br />THE APPROPRIATE TRAINING AND SKILLS. <br />THIS TANK CONFORMS TO APPLICABLE <br />PORTIONS OF THE FOLLOWING STANDARDS: <br />NFPA 30 AND NFPA 37, VL 142 <br />2. DRAIN WATER AND SEDIMENT FROM <br />DAYTANK SUMP AT LEAST ONCE EACH YEAR, <br />OR MORE FREQUENTLY DEPENDING ON <br />USAGE AND CONDITION OF THE FUEL. <br />3. WHEN THE MAIN FUEL STORAGE TANK IS <br />LOCATED ABOVE THE LEVEL OF THE DAY <br />TANK, THE FOLLOWING OPTION IS RECUIP.ED: <br />OPTION 375; GRAVITY INLET CONTROL. CON <br />SISTING OF DUAL IN-LINE SOLENOID VALVES, <br />FLOAT VALVE, MANUAL ISOLATICN VALVE. <br />CONSIDER ALSO: #170; 50 PSI CCNSTRUCTICN, <br />*Igo' 1191: OVERFLOW BASIN. #383: AUTOMATIC <br />OVERFLOW TANK. <br />4. RECOMMENDED OPTIONS! <br />A. WHEN THE MAIN FUEL STORAGE TANK <br />IS LOCATED UNDERGROUND. ONE OF THE <br />FOLLOWING OPTIONS IS RECOMMENDED TO <br />ASSURE MAINTENANCE OF DAY TANK PUMP <br />PRIME: OPTION 080, 083: SOLENOID VALVE ON <br />PUMP INTAKE. OPTION CDC: FOOT VALVE. <br />CHECK VALVE IS SUPPLIED AS STANDARD. <br />B. ONE OF THE FOLLOWING HAND PUMPS <br />IS RECOMMENDED FOR USE AS A BACK-UP TO <br />THE MOTOR PUMP AND TO PRIME THE MOTOR <br />PUMP ON INITIAL INSTALLATION: OPTION 010, 1 <br />GPhi (8 STROKES/GALLON) PISTON HAND <br />PUl.iP, OPTION 01S. 5 GPM IS STROKESI'GAL- <br />LON) HAND PUMP. <br />m_ <br />CIO <br />= I i ZK <br />`nom! 1 .., •i; .,,i I;�g <br />mvEt <br />FV3A <br />THE lI.FOHMATION HEAON IS THE PROPERTY OF SIL4vLEX. INC. <br />ANY co"WG TRRAtBW'"AL TO OTHER`+ ANO `i+E EXCEPT <br />THAT FOR WM:CH IT IS LCANEO 13 PROHB!TED <br />1!-3 %,:. ll-camhvr T11 <br />t / _ ..... <br />` •'Ti <br />1 1 ;-�.p•-r M� <br />i _ �• I , • 1 O Mltr <br />•.R4M1. 1 <br />I \ I I J <br />e.. .c....'-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.