My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_1985-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 12:53:34 PM
Creation date
6/3/2020 9:50:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2005
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_1985-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RRu.h•.� SAN JOAQUIN COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />1610 E HAZELTON AVE., STOCKTON, CA 95205 <br />��' 1��•�►� DEVELOPMENT SERVICES PHONE: (209( 468.3120 <br />PLANNING PHONE (209( 468.3120 <br />BUILDING PHONE: (209( 468.3123 <br />NEIGHBORHOOD PRESERVATION PHONE (209) 468.3021 <br />Project Location <br />Owner <br />ro <br />BACKFILL EXCAVATION CERTIFICATE <br />Phone No. <br />Contractor !,%Jr( L f .f Phone No. f - 2. -3 1- z. -L u 6License No. <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />_ 2. Submission of verification, e.g. load ticket, within 30 days of project <br />completion that one of the following materials was placed in the excavation in <br />12" lifts: <br />_ A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />B. Crushed rock - self -compacting material not more than three-quarters <br />!' (3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />1/ <br />* r W I.....I C <br />Name (Print) <br />Title int) <br />ure <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.