Laserfiche WebLink
P <br /> s i t r r rage Tank (USAperator cli <br /> Monthly Visual inspection Checklist <br /> Facile Mame: efo ®ate: �m <br /> Facili Atldres AA <br /> City: , W A/Y)Z,71 lZip Code: <br /> Valley Underground Tank Monitoring <br /> Mailing and Remittance Address: Valley Underground Tank Monitoring <br /> P.O. Sox 91 <br /> Stockton, CA 95201 <br /> Designated UST Operator Conducting the Inspection: <br /> Internation e Council Ce ifi tion x iration Date: <br /> i nature: 41, Phone: ( g� <br /> Y=Yes, N=No, NA=Not Applicable <br /> Item Monitoring Panel/Alarm Histo!jY N NA <br /> Monitoring"-system is powered on ana in proper operatin <br /> onitoring system is not current y s owing any a arms or warnin s. <br /> arm istory port/log fort the previous-month-is available,and has been reviews <br /> by the Designated UST Operator. (Attach a copy of the alarm history repor0og if available). <br /> -77 ach a arm or t e previous mont as been respon e o approprlate y. <br /> Sensors oca a in tan -top containment sumps have not alarmed in the past mont . <br /> a ist a tan -top sumps where alarms occurre rn t e past moat 1 <br /> Note:Sumps where an alarm has occurred in the past month must be inspected unless a qualified service <br /> technician responded to, and properly addressed, the cause of the alarm. Attach documentation verifying <br /> appropriate service to this reportif sump inspection is required,record results in item 6,below. <br /> T System Inspection <br /> Tank-top containment sumps are ree o water, ens,an azar ous substance. <br /> Sensors are located properly. NoteMsual inspection of sumps are only required <br /> m n sumps where an alarm has occurred in the past month for which there is no service record <br /> ump ocatior flUuocation:ump ocation: ocateon:ocateon: ocateon: <br /> pi containment structures are free of water, debris,and hazardous substance. <br /> Tank - ontents: _ an - ontents: <br /> an - ontents: an - ontents: <br /> Hit 1-11 <br /> Under--dispenser containment areas are ree o water, debris,an azar ous substance. Sensors <br /> are located properly. <br /> espenser1/2 ispenser <br /> espenser espenser 11712 <br /> espenser espenser 13/14 <br /> Dispenser espenser <br /> Paperwork Inspection `( N NA <br /> orntonng system cern,cation as l5een completed within past 12 mont s. <br /> icon arycontainment tests have been completed within require timera - <br /> Spill containment structure(bucket)testing was compete wit in past year <br /> Tank tig mess testing was completed within Te—quired timeframes. <br /> 13 Line tightness testing was completed wit in require timeframe. <br /> 4er require testing/-maintenance was comp e e wi in require ire rame. (List maint. items below). <br /> es maintenance: <br /> Test/maintenance: <br /> es maintenance: <br /> acilit Employee Training Y J N NA <br /> 15 All facilityemp oyees have receive t e require on-t a Jo training int a past year. <br /> facility-e-m-pTo—yees-hired within the past 30 days have receive t e require <br /> on-the-job training. <br /> of r of"N"should be explained int the comment section on the folloWfing page, <br /> and will require follow-up action. <br /> Pg. 1 of 2 <br />