Laserfiche WebLink
A �SWRC13 January 2002 Page �—of z— <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer ❑ Industry Standard ❑Professional Engineer <br /> -'00C ther(Specify) <br /> Test Method Used: ''ressure ❑ Vacuum ❑ Hydrostatic <br /> M <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: //a <br /> Piping Run# Piping Run# 2., Piping Run# Piping Run# <br /> Piping Material Ifl bLe 1(4 1SS �D fir S S <br /> Piping Manufacturer: �} P'" <br /> Piping Diameter: <br /> Length of Piping Run: rJ , 25o J myz*• <br /> Product Stored: `L VLt 4u_�v1 <br /> Method and location of s� b6v4-.4 -es-�- <br /> y <br /> piping-run isolation: ; r» u y` s <br /> Hs <br /> jimn <br /> jgte <br /> e between applying <br /> vacuum/water andst: l r,art S L 64 f&ty-�Y S <br /> Test Start Time: (t ; d l 3 6 <br /> initial Reading(111): P3 <br /> Test End Time: 12 V /Z 3 U <br /> Final ReadingR <br /> ( F)� <br /> Test Duration: V, tc <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or <br /> Criteria: N 0 (,0 5 S rN � 5'r �U U L,u5 S <br /> Test Result: Pass ❑Fail Pass 0 Fail ❑ Pass ❑ Fail Pass ❑Fail <br /> Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />