08/.27/2010 15:25 2093675424 BAGLEY ENTERPRISES PAGE 02/05
<br /> Y $ Oa 41f27�Gla
<br /> UNDERGROUND STORAGE TANK
<br /> RES ONSE PLAN—PAGE 1 (one farm p r facility)
<br /> TYPE OF M MON ❑ I,NEW PLAN CHANGE OF INFORMATION Ito
<br /> I. FACILITY INFORMATION
<br /> FACILITY ID# (Agency Use Only)
<br /> BUSINESS NAME(Same as VACILITY NAME) Roe
<br /> SfM.► -'Tt7A S U PJ G E iJC �'1r
<br /> BUSINESS SiTE ADDRESS ROj• I CITY RrK
<br /> Soca w fa sr- =trt-• tZvA D Fa£«1Gµ e.Am p CA R5 2 3)
<br /> U. SPILL CONTROL AND CLEANUP METHODS
<br /> This plan addromm unauthorized Iiclrascs from UST systems and supplemetlts the emergency rospoose plans and pmcetltrm in the facility's Hazardous Materials
<br /> Business Plan,
<br /> > If safe to do so,facility personnel will take;mnicdiate meosures to control or stop any release(e,g„activate pump shut-otT.etc.)and.if necessary,safely remove
<br /> remaining bazardous material from the UST system.
<br /> > Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to
<br /> contain the h=dous material,but not greater than 30 eaiendar days,or sooner if required by the local agency. Recovered hmrdous nxueriais,unless still suitable
<br /> for their innmdod use,will be managed as hazardous wwto.
<br /> >y Absorbent material will be used to contain and otcan up manageable spills or hazardous materials, Absorbent material which has become too saturated to he
<br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 rinds that
<br /> it is non-hamrdow, Used absorbent material,reusable or waste, will be stored in a properly lobcled and AMbLontailm, Waste material shall be disposed
<br /> appmpn•fatciy.
<br /> 1? Facility personnel will determine whether any water removed from secondary containment systems, or from ckzrj-up activity,has been in contact with arry
<br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in occordanee with 22 CCR§M262,1 i finds
<br /> that it is non.hazardotuc, if the water has a petroloum sheen(i.e.,rainhow colors),it is Contaminated. A thick floating petroleum layer may not necessarily display
<br /> rainbow colors. Water(hazardous or non-hazardaus)from sumps,spill containrxs,etc.will not be disposed to stem water systems.
<br /> Y We will review secondary conta(nmcnt systems for possible doterioral ion i f any of the following conditions occur:
<br /> 1. Hazardous material in contact with secondary containrrnmt is not compatible with the material used for secondary containment;
<br /> 2. Secondary containment is prone to damage fmm any equipment used to remove or cican up bvwdous material collected in secondary containment;
<br /> 3, Hazardous materiai.other than the product/waste stored in the primary Containment system,is placed inside secondary containment to treat or neutralize
<br /> released praductlwastc,and the added material or resulting matcriai from such a combination is not compatible with secondary containment.
<br /> ill. SPILL CONMOL CLEAN-UP(EQUIPMENT
<br /> PERiODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan, This
<br /> equipment is inspected at least monthly,and after each use,supplies ase reptertishcd as necded. Defcctive equipment is repaired or replaced as pe cmAry,
<br /> LqUIPMENT NOT PERMANF,NTt,Y ON-STT°- BRJT AVAiLARI,E POR USF,iF NFFDRD: Com letc ly ifapplicable)
<br /> EQUIPMENT LOCATION AVAN ABiLTTY
<br /> RK R30, RX
<br /> RI L. R21. R31.
<br /> Ri±,
<br /> R13,
<br /> R14, RV. k44,
<br /> RIS. It", lus,
<br /> IV. RESPONSIBLE PERSONS
<br /> THE FOLLOWING,PERSON(S)iSlARE RESPONSIBi F.FOR AUTHORIZING ANV WORK NECESSARV UNDF,R THiS RESPONSE PLAN:
<br /> NAME Iwo. T#'F" Rea
<br /> NAME 55� SSS k41. IITI.A3
<br /> SST, �r(a►Gi'LyTy trtcll`trNAG X1
<br /> NAME �SPkI (�t 4t.tl�y ' '- 1r1iTILBI.1S'I'1bo f CV"AA4. FDR
<br /> T.
<br /> LOU.
<br /> !!visa,
<br /> NAME -IYS%f- Bfioa tiUM R41 TITLE U S-M& /C®IJT•Q fmkL ST G€N. WASP
<br /> R53.
<br /> V. MONITORING INDICATORS
<br /> IF M ORiNG INDICATES A POSSIBLE UNA ZED RELEASE,STEPS TO VERIFY THE RELEASE WiLL BE MADE AS FOLLOWS:
<br /> dditiotaf system testing ordain collection nspexlion by qualified persRms IR'^alihratinn nfagripmerti, use:Esj q�yr
<br /> Other:
<br /> UST Response Plan(3/20M)-113 �,
<br />
|