My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 1:21:17 PM
Creation date
6/3/2020 9:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231614_500 W HOSPITAL_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALEY ENTERPRISES, ICRC L� <br /> LIQUID HANDLING SOLUTIONS <br /> 2370 Maggio Circle,Unit 44,Lodi, CA 95240-8828 ENI/1 r, <br /> T#: (209)367-4800/F#: (209)367-5424 IFNT t1 <br /> Contractor's License#774802 /S <br /> www.bagleyenteMrises.com <br /> July 20, 2009 <br /> Re: SAN JOAQUIN GENERAL HOSPITAL STATEMENT TO ACCOMPANY "RETURN <br /> TO COMPLIANCE" <br /> WHILE CONDUCTING A SCHEDULED TRI-ANNUAL SB 989 SECONDARY <br /> CONTINMENT TESTING OF THE UNDERGROUND STORAGE TANK SYSTEM IT WAS <br /> NOTED THAT A SECONDARY CONTAINMENT PIPE FOR THE PRIMARY TURBINE <br /> SUPPLY LINE WAS CRACKED. THE CRACK EXTENDED FORM INSIDE THE SUMP TO <br /> APPROXIMATELY 4 INCHES OUTSIDE THE SUMP. FURTHER INVESTIGATION <br /> REVEALED THAT A SECONDARY CONTAINMENT PIPE FOR THE PRIMARY TURBINE <br /> RETURN LINE WAS ALSO CRACKED IN AN ALMOST IDENTICAL MANNER. <br /> REPAIRS WERE MADE AND ALL APPROPRIATE TESTING WAS CONDUCTED AND <br /> THE SYSTEM WAS RETURNED TO NORMAL OPERATIONS. <br /> JESSE BERUMEN <br /> PROJECT MANAGER <br />
The URL can be used to link to this page
Your browser does not support the video tag.